NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection report, 20 [name] Premises

Machine-extracted title · confidence 32%

Asbestos inspection report for multiple vendors at 20 [name] building; photos and inspector listed.

NYC-WTC_000385719
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ASBESTOS INSPECTION REPORT PAGE 1 OF 1 PREMISE ADDRESS 20 Broad Street ZIP |ORO CODE BLOCK LOT SQUAD 1 BADGE# AO78 Facaaes PHOTOS TAKEN Yes INSPECTOR R. RAMMOHAN BLDG.. TYPE BASIS OF INSPECTION TRU1285MN02

Vno'^'sSesfds kemoval Corp. SAMPLE NO.--------

129 Street CollegTPoint SAMPLE NO.-

SAMPLE NO. — 55V" 11^56 (fW961-4100_______ ^Sen’^’kanzer Engineers P.C. SWolWeetCo.LLC.___________ 45 Street NewVork ^^’Broad Street New 55V" itSrn (2^^22-0077 109b4 (S2jr269-8171 CONTACT PERSON Denise Cassidy, Building Manager TIME OF INSPECTION FROM; 8 am — 5 pm

INSPECTION DISCLOSED: Sunday 8/10/02: Henry Infantas, Cert#88020and 8 handlers of Trio and David Ezekwesili AH 01-02104 of Warren&Panzer on site. Cleaning on 26* floor roof started and completed at 4pm. 28* floor elevated roof completed at 8pm and lower level cleaning 30% completed. Waste bagout began at 9;30pm. ATC truck arrives at 10pm and loading of waste bags compiled at 10:40pm and I departed after a visual inspection at 11:20pin. Saturday 8/17/02: Henry and 7 handlers and Marek of Trio & David of Warren&Panzer were on site. Mobilization to 28* floor elevator lobby after plasticization of floor. Continuation of 28* floor and starting of 24* floor setback began. Tom Donohue, The Building Engineer on site providing assistance. I departed from the premise after preparation work was satisfactory in the office space at the 24* floor. Photographs were taken. I depart on annual Leave from 8/17/02. Saturday 9/14/02: Gerardo A. Quintanille and 8 handlers of Trio & Edman Dibra AH 01-12337 of Warren and Panzer were on site for the 13* floor setback gravel cleaning. Office space on 13* floor was plasticized prior to work start on the setback. 13* floor completed at 10pm. Bags were moved out of the building. Saturday 11/16/02: Jan Wolkowicz and 6 handlers of Trio and Celestine Obika of Warren and Panzer were on site. Scaffold #1 was covering the fayade on Broad Street from west side covering One Bay of windows (3Rows) and Scaffold#2 covering two bays of windows (6Rows) at the comer of Exchange Place and Broad Street, began cleaning. Up to the 11* floor window ledges cleaning completed from the 22"^ floor. Sunday ll/17/02:The cleaning of ledges continues on both the scaffolds and the entire levels were completed at the end of the day. The scaffolds were dismantled completely and removed from the premises. Saturday 11/23/02: Jan Wolkowicz and 6 handlers & Oghogho Erhaber of Warren& Panzer. Two scaffoldings were assembled on Broad Street side for the fcade windows and ledges cleaning. Both the scaffoldings were up and cleaning was in progress covering 8 rows of windows. Sunday 11/24/02: Both scaffolds continue from 10* floor and down cleaning the facade. The facade cleaning completed at the end of the day and scaffolds were dismantled. Saturday 12/07/02; Ireneusz Womoezyl and three handlers were on a 130ft boom lift cleaning the windows and ledges on New Street side facade. Six rows of windows were completed at the end of the day. A second crew comprising of Jan Wolkowicz and five handlers on two scaffolds cleaning windows and ledges on Exchange Place and completed the entire drops. Festy of Warren and Panzer performed air sampling. Sunday 12/08/02: The same two crew continued working on lift truck and scaffold and completed facades on New Street side and Exchange Place. Saturday 12/14/02: Ireneusz Womoezyl and five handlers were on two scaffolds on Exchange Place facade and began cleaning the windows and ledges. At the end of the day the entire length of facade cleaning was completed and this will conclude the cleaning of the entire exterior of the premises.

Project Completed. NOV# INFRACTIONS RESULT CODE 5 NOV# SUPERVISORS INITLALS

BOBO—r IMEANHATTAN 2 = BRONX IKLVN—zr X UEENS S' TATEN ISLAIN D

BLDG. TYPE A > 6 STORIE,S B< 6 STORIES C SINGLE FAMILY D SCHOOL E HOSPITAL F PUBLIC OWNED PROPERTY RESULT CODES 1 = Violation Issued 2 = No Violation Issued 3 = No access 4 = Proiect not Started (no NOV) 5 = Public Owned Property ACP3093

CITY_21MC100_011234713

NYC-WTC_000385719

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000385719Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →