Asbestos abatement findings, USPS 4th floor

Machine-extracted title · confidence 45%

Report on damaged ACM discovered and abatement/air monitoring per NYC requirements.

NYC-WTC_000366612–000366613
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

URS October 3, 2001

I Mr. Nick DeCarlo. CHMM, CPE.A District Environmental Compliance Coordinator I United Slates Postal Service New York District .lames .A. Farley Building I 421 S"’ .Axenue, Room 5012' New York, New York 10199-9800

I Subject: Peck Slip Station 4’’' Floor .\sbestos .Abatement

I URS Project No. 89-FUSPS035.02 42001

Dear Mr. DeCarlo; I During cleaning of standing dust from Peck Slip Station during the week of September 17, 2001, damaged asbestos-containing materials (.ACM) were discovered on the 4"' floor of the facility. These I materials consisted of small areas of damaged asbestos-containing pipe insulation (4“' floor men’s restroom) and loose/broken 9" x 9" asbestos-containing floor tiles. Additionally, repair of asbestos- containing pipe insulation ends needed to be performed using non-asbestos lagging cloth. I Comprehensive Environmental Sendees. Inc. (CES), who was onsite to conduct the standing dust cleanup, was also tasked with performing the ACM abatement and repair. That abatement/repair operation was completed on September 19, 2001. I Air monitoring conducted by URS Corporation ( URS) during the minor abatement operation indicated acceptable air quality as per the requirements established by the New York City Department of I Environmental Protection (NYCDEP). Air samples were analyzed by phase contrast microscopy (PCM) in accordance with NIOSH Method 7400 and resulted in airborne fiber concentrations of <0.01 fibers per cubic centimeter (f/cc) of air sampled. The URS field log and all sampling/analytical data are I included as an attachment to this report. Il should also be noted that following the asbestos abatement, the entire 4'*' floor was cleaned of residual

I standing dust by CES in accordance with the USPS post-disaster clean up protocol, followed by air sampling and analysis for asbestos and other potential contaminants. The airborne asbestos analysis for this clean up effort was conducted by transmission electron microscopy (TEM) and resulted in no I asbestos structures detected. Bused on I he sal is factory air monitoriny. the 4^^ floor of Peck Slip Station is considered acceptable for

I re-occupancy. It should be noted that additional ACM exists on the 4’* floor as well as in other areas of the facility, however, the damaged material existing on the 4'*' floor at the time of this effort had been cleaned up/abated/repaired during the course of this clean up.

I I URS Curooratioii 200 Orcfiarc RiUge Drive. Suite 101 I ..iiIlierstiuiK, MD 20878 tel 101,258.9780

I Fix 101 869 8728 I \83-FUSPS000 OOIACTIVE WORK OROERSkWO OlSVUlwcupPMd FaoliinikPsck Slip SIMan\USPSpack>lipubabaM9-0irinairepan doc

CITY_21MC1OO_OO23525O3

NYC-WTC_000366612

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000366612Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →