NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection report, NYC Buildings permit

Machine-extracted title · confidence 28%

Asbestos inspection report portion of permit filing; DOB submission.

NYC-WTC_000363473
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ASBESTOS INSPECTION REPORT (continued)

26. Asbestos Hauler • nYS dec Permit # Tel.#

Disposal Site(s)

27. This asbestos abatement is part of a (Item a through e requires filing of this form with NYC Department of Buildings) I] CO Demolition b) CO Boiler Replacement c) O Sprinkler Replacement d) Q Renovation/Alteration a: e) CO Fireproofing Replacement f) CO Other (Describe)

28. TYPE OF ABATEMENT (Check all appropriate boxes) □Removal Enclosure□ CO Encapsulation CO Repair □ Clean up

29. ABATEMENT PROCEDURE (Check all appropriate boxes) □ Full Containment CO Glovebag □ Tent DEP Variance Application□ 30. LOCATIONS OF ABATEMENT DESCRIBE SECTION AFFECTED SURFACES AMOUNT OF ACM DESCRIPTION OF WORK BEING Floor(s) OF FLOOR CONTAINING ACM SQUARE LINEAR PERFORMED (e.g. entire, east wing, room 0. (e g. Pipe lagging, ceiling, plenum (e g. running cable, installing fire sprinklers, boiler room, lobby, etc) ducts, storage tanks, decking, etc.) FEET • FEET removing and replacing boilers, etc.)

5 P at ____________

31. I hereby declare that the information provided herein is true and complete to the best of my knowledge. I am familiar with Federal, State and NYC laws and regulations applicable to asbestos related work.

Print Nam^f Air Monitor Print Mame of A^stos Contractor Pent Name of Applicant Of other than Owner)

lure £>2)^3/^^ ' Dale * ’Oate Date Date ~

32. I understand that as the owner of a building where asbestos abatement activity occurs. I am responsible for the performance of the asbestos abatement activities in accordance with the Asbestos ControfRrogram-Rules. I have contracted the third party air monitor who is cornpletely independent of all parties involved in Ihe'asbestos project. I hereby declare that I have authorized the filing of this notification for the work specified herein. 'll 3 g P__________ / /azla3 Print Name of Ownef T Signature Date

A STAMPED COPY OF THIS FORM INCLUDING AMENDMENTS MUST BE AVAILABLE AT THE WORK SITE.

I Any modification of information provided on this form must be reported immediately in writing directly to the NYC PEP ACP. I

The requirements of the Asbestos Control Program Rules may hot be lawfully avoided or lessened ____________ through the performance of work in incremental or piecemeal fashion.____________ ACP7 znooi

r CITY_21MC100_002858818

NYC-WTC_000363473

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363473Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →