ASBESTOS INSPECTION REPORT (continued)
26. Asbestos Hauler Co c3 MA) 0 NYS DEC Permit Oi Tel.
Disposal Site(s)
27. This asbestos abatement is part of a (Item a through e requires filing of this form with NYC Department of Buildings) '
a) ❑ Demolition b) ❑ Boiler Replacement c) ❑ Sprinkler Replacement d) ❑ Renovation/Alteration
e) ❑ Fireproofing Replacement t) ❑ Other (Describe)
28. TYPE OF ABATEMENT (Check all appropriate boxes)
❑ Removal ❑ Enclosure ❑ Encapsulation ❑ Repair ❑ Cleanup
29. ABATEMENT PROCEDURE (Check all appropriate boxes)
❑ Full Containment 0 Glovebag ❑Tent ❑ DEP Variance Application
/~
30. LOCATIONS OF ABATEMENT ~fi ®~ o
DESCRIBE SECTION AFFECTED SURFACES AMOUNT OF ACM DESCRIPTION OF WORK BEING
Floor(s) OF FLOOR CONTAINING ACM PERFORMED
(e.g. entire. east wing. room #. (e.g. Pipe tagging. ceiling. plenum SQUARE UNEAR (e.g. running cable. installing fire sprinklers.
baler room. lob , etc ducts. store a tanks. decki , eta FEET FEET removIng and replacing boilers. eta
31. I hereby declare that the information provided herein is true and complete to the best of my knowledge. I am familiar with Federal.
State and NYC laws and regulations applicable to asbestos related work.
Sc~~ c#Fttits~t
Pnnt N r itof
LAA —
vmCc2
Prin Name/f
e L[1—
stos Contractor
x)ihôAl
Print Nam of App cant (if other than Owner)
S!9nature nature Signature
--3 _02.
Date Date Date
32. I understand that as the owner of a building wh re asbestos abatement activity occurs, I am responsible for the performance of
the asbestos abatement activities in accordanc with the Asbestos Control Program Rules. I have contracted the third party air
monitor who is cpmpletely independent of all rties involved in the asbestos project. I hereby declare that I have authorized the
filing of this n ificatio or the work specified erein.
D/
Print Marne of owner Signature Date
, &,STAMPED COPY OF THIS FORM INCLUDING AMENDMENTS MUST BE AVAILABLE AT THE WORK SITE.
Any modification of information provided on this form must be reported immediately in writing directly to the NYC DEP ACP.
The requirements of the Asbestos Control Program Rules may not be lawfully avoided or lessened
through the performance of work In Incremental or piecemeal fashion. Acrr
2a001