NYC 9/11 Public Portal Document
E O ~t
4
YC DEPARTMENT OF ENVIRONMENTAL PROTECTION
Asbestos Control Program
Ar 59-17 Junction Boulevard, 8°i Floor. Corona, NY 11368-5107
KITTEN
D:,P: ASBESTOS PROJECT NOTIFICATION
ORMS WILL 8E `"`"` jO (ASBESTOS INSPECTION REPORT)
ACCEPTED
When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original
signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This
form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities.
I. FACILITY
2. Address l ~3 E r 2E E T Borough N~ Zip t 00 t♦ 3
nn
AKA I 0 — t0 CJ • __ 3. Block -- 4. Lot _
5. Type of Facility, 6. Name of Building
11. BUILDING OWNER
7. Name _ _ 9(L D/ rlA`I - -- I' (. Contact Person
9. Tel. # _ — Fax#
10. Address iiI2cQ-°--_ &L. City -- IN_ 1 State t 'fZip..J 0~
III. GENERAL CONTRACTOR
11. Name_________ ...._---- Tel. #
IV. ASBESTOS ABATEMENT CONTRACTOR
12. Name eIL ------ —_13. Contact Person t?c Lil-
/ ?
14. Federal Employer 10. # —~ -2 1- 3060
15. Tel. # 66-
i Fax # ---~ _—_
16. Address OlJc_2' 1~_------ City g__ State / Zip J _
V. THIRD PARTY AIR MONITOR
i44L Nof^p_(
17. Name _ (v ) ~j_ 2 -Ea NG i^ka~'~S,f PIC 18. Contact Person
19. Federal Employer ID. # ___----- 20. Tel. # a r3=~aa - 0O — Fax # .l 0
21. Address ~~ g1 C r{ Z — City /(k1A _T.Q=&— State Lam _ Zip _(0o
22. Sample Analysis Laboratory— SG(mot I; t I( r7 i 23. NYS DOH ELAP #_ (f O
VI. PROJECT INFORMATION
3O_jôa
// ~~
24. Starting date for this portion of work _Sp 7 _ Projected completion date —
Asbestos work schedule ❑ Monday 0 Tuesday 0 Wednesday 0 Thursday 0 Friday ❑ Saturday ❑
'f. 1
Shift from: __ 0 am 0 pm to 0 am ❑ pm
If other,
specify ------------ —~ -
Access to inspect the premises must be provided during the work schedule indicated in this item.
25. Total amount of asbestos-containing material to be abated during this work U
Square Feet, and/or — Linear Feet fN
ACP
21200
O
' .Sc'4xi
tFu
NYC-WTC 000111120
OCR can misread numbers and units. Confirm readings against the page image before using them.