NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 12 pages

Lab report: WTC debris cleaning scope, July 2002

Machine-extracted title · confidence 36%

Laboratory text outlining compliance with EPA/OSHA/NYSDOL regulations for cleaning and sampling related to WTC debris.

NYC-WTC_000362992–000363003
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

C. Qualifications Proof of qualifications must be presented upon request, including qualifications for wipe sampling, personal monitoring and HVAC evaluations.

Project Monitors The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. The Project Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Project Monitor must have performed final clearance inspectic^on at least 50 asbestos abatement projects. The Project Monitor must have access to translation services to schedule pre-cleaning unit inspections with residents. r

Technicians ■ Ilir Air monitoring technicians must possess valid N YS Asbe feet Sampling Tei B(apst) certificates. Technicians must have performed air sampl: t least 6 months.

Sampling Parameters Methods ■1. Asbestos NIOSH Methi 1400 & 7*102 b 2. Total Metals EPA Method 846 601 OB 3. Mercury EPA Method 846 7471A • JI. D. Specifications , Clean-up activities shall be scheduled for 20 units per day. Air sampling shall be scheduled and completed in these units within 24 hours of successful inspection by the Proj ect Monitor. Air sampling shall also be provided at 10 to 20 units where clean-up activities are not scheduled. Sufficient pel lel shall be available for project monitoring and sampling. , . IB- kh The contracts all have available sufficient quantities of sampling equipment to provide the amount and t 3f samples required for this project. At a minimum the following equipment is required: air-i ding pumps with maximum flow rate capacities of 15 liters per minute, tripods. rotometers. s: iple ith mixed cellulose ester filters having pore size of 0.8um.

The Monitoring Contrai ir shall prepare a Health and Safety Plan (HASP) in accordance with 29 CFR 1910.1001 and29< 'R1926.58. All personnel involved in residential cleaning and monitoring nivitics shall follow the Health and Safety Plan (HASP) prepared by their employer. EPA shall be rovided with a copy of the employer HASP prior to the start of work.

Moni tor shall attend a kick off meeting prior to commencement of sampling activities. At ^fthe Contractor shall, but not limited to, participate in scope of work discussions. sampling logistics, obtain resources for residential information provided by EPA and DEP, and demonstrate data acquisition procedures and software.

The Contractor shall attend meetings or conference calls with EPA and coordinate field activities, as requested.

CITY_21MC100_003754677

NYC-WTC_000362993

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000362993Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140306 · Box DEP Box 05

Procedures for obtaining work authorization, monitoring residential and HVAC cleaning, and reporting hazardous conditions to EPA.

Similar indexed content

NYC-WTC_000332061

Draft scope of work for WTC dust cleaning and related regulatory alignment.

Similar indexed content

Compare copies and versions →