NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 13 pages

Dust Cleaning, Draft 7/10/02, continued

Machine-extracted title · confidence 39%

Continuation of draft scope for indoor cleanup and sampling.

NYC-WTC_000363004–000363016
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

C» Qualifications Proof of qualifications must be presented upon request, including qualifications for wipe sampling, personal monitoring and HVAC evaluations.

Project Monitors The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. The Project Monitors must have served as a third party project monitor on at least 20 asbestos aibateincnt projects. Project Monitor must have performed final clearance inspection .on st 50 asbestos abatement projects. The Project Monitor must have access to translation rrices to schedule tails. pre-cleaning unit inspections with residents.

Technicians Air monitoring teclmicians must possess valid NYS Asbestos [ect Sampling Ted (APST) certificates. Technicians must have performed air sampling 1 t least 6 months.

ALL analytes and methods should be listed here wliilK

Sampling Parameters Methods 1. Asbestos NIOSHMethoi 3 & 7402 - xyvt 2. Total Metals EPA Method S 3. Mercury Method SW-8 K

D. Specifications Ills Clean-up activities shall be scheduled for per day. Air sampling shall be scheduled and completed in these units within 24 hours ofi j visual inspection by the Project Monitor. Air sampling shall also be provided 10 to 20 units where clean-up activities are not scheduled. Sufficient personnel shall be aval e for project monitoring and sampling. . ’w The contractor shall have available sufficient quantities of sampling equipment to provide the amount and type o [uirel for this project. At a minimum the following equipment is required: air-sampling put , with maximum flow rate capacities of 15 liters per minute, tripods, rotoineters, sample casset with mixed cellulose ester filters having pore size of O.Sum.

The Monitoring Contractor shall prepare a Health and Safety Plan (HASP) in accordance with 29 CFR 1910.1001 and 29 CFR 1926.58. All personnel involved in residential cleaning and monitoring activities shall follow the Health and Safety Plan (HASP) prepared by their employer. EPA shall be provided with a copy of the employer HASP prior to the start of work. "WlMMIIP. The Project Monitor shall attend a kick off meeting prior to commencement of sampling activities. At this time, the Contractor shall, but not be limited to, participate in scope of work discussions, sampling logistics, obtain resources for residential information provided by EPA and DEP, and demonstrate data acquisition procedures and software.

CITY_21MC100_000439019 NYC-WTC_000363005

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363005Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →