NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

FEMA project worksheet, Apr 2002, NY BOE

Machine-extracted title · confidence 34%

Narrative on asbestos considerations in WTC construction materials.

NYC-WTC_000359490
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

federal emergencv management agency O.M.B. No. 3067-0151 PROJECT WORKSHEET • Narrative Street Expires April 30. 2OCT

I PROJECT NO. FIPS NO. 1 DATE 1 CATEGORY DECLARATION NO: FEMA- 1391 -DR- NY| 061-51000-22 I 04/15/02 APPLICANT COUNTY New York City, Board of Education New York NARRATIVE

More than 200,000 ions of sicel end 425,000 cubic yards ol concrete were used in the consfruclion of the WTC complex. One WTC (North Tower) was completed in December of l£70 ano Twc WlC (South Tower) was completed in January of 1972. The federal regulations restricting the use of esDestos in concrete and other construction material began to be enforced in ihe early i&70‘s. Although.asbestos gives concrete a much higher tensile strength, asbestos Obers are known to have caused such diseases as Asbestosis and Mesothelioma, as well as lung cancer, when inhaled. These asbestos fibers ere most hazardous when they are in a friable or pulverized stale.

The U.S. Environmental Protection Agency (EPA) * Asbestos Hazard Emergency Response Act (AHERA), Section 206 of Toxic Substance Coniol Act (TSCA) stales that it's legal function is to provide for the e-stsblishment of Federal regulations which require inspection for ssbestos-containiriQ materiel end implemenletion cf appropriate response actions with respect lo asbesiOE-coniaininc msierial in the Nation's schools in a safe and complete manner and to mancaie safe end complete periodic reinspection of school buildinos following response actions, where appropriate. A memorandum from R. Radhakrshnen, P.E. from the City of New York, Dapanmeni of Environmental Proiection. csted September 14, 2001. cave guidance to building owners on procedures for clean-up of asbestos containing matehats (see attached document) . T his memorandum end the U.S. Environmental Protection Agency (EPA)' Asbestos Hazero Emergency Response Act (AHERA), Seciion 206 of the Toxic Substance Control Act (TSCA) were used as s basis for the necessary procedures to be pertormed at each school.

School Construction Authority (SCA) School Construction Authorily was responsible tor the COOrOinsiion and construction management of the contiaciors on behalf ol BoE. The School Construction Authority (SCA) acts on behalf of the New York Board of Education (BoE) to manage all major consifuciion, repairs, rehabilitation and dean up of all New York City schools. Costs associated with the work performed by SCA consists cf regular rme laCO' ($2.13S.O$). including Hit New York City legular lime fringe benefit rate for non-uniform employees of 44.56% <5955.30). 1 Otel incuried co&i for regular time labor is 53.094,35. Costs sssbeisted with the ovenime for labor for SCA ($6.C30.l3). including the New York City overtime fringe benefit rate for non-uniform employees of 10.73% ($647.04). Total incurred cost for overtime labor is $6,677.17.

Air Tech Lab, Inc, Air Tech Lab, Inc. conducteO interior clean up at PS/lS ££ from January 3 to January 10. 2002. This cleanup wuork consisted of an miensive dean up cf visible Oust utilizing wet wipe methods and HEPA vacuumed the 1st. 2n0. 3rd, 4th. and 5th floors and the 6th floor mechanical end boilei room. Cleen-up performed by KISS Construction cost $44£.999.74. Invoice from Air Tech Lab is included in “Back Up Do Not Scan” '

V fi R Mechanical Inc. V £ R Mechanical was reiairied by SCA lo clean the HVAC system in PS/IS 89 This was performed lo remove all dust and debris potentially coraamir.sied with asbestos and to prevent asbestos conieining material to spread throughout {he building. All work perlormed ur^dei this contract was in accordance to the National Ait Duct Cleaning Association (NADCA) Standard £2-01. Costs associated with HVAC cleaning performed by V 8 K total 5386.000.00 in aGdilion. costs were also incurred for the labor and materials required to lemove and re-install existing wall unit ventilators in order tc edeouately clean the system ($70,000) and to remove existing insulation impacted by dust and Oebris gne replgce with new insulstion ($7,500). Total costs associated with the work pertormed by V 8 R is $465,500.00. Invoice from V S R is included in “back Up Do Not Scan*.

Corinthian Construction Corinthian Construction was retained io remove all debris end dusf iiom the e^tetioi iecede oi the building, courtyards and playgrounds. The exterior facade of the building included all masonry and windows, tn addition, the dust an debris that accumulated in the courtyards ano on the playground was power washed. Cleaning to the facade of the building, counyeros end playground, conducied by Corrnihien. cost $231,500.00. invoice from Corinthian is included in "Back Up Do Not Scan”.

In addition, Corinthian also perlormed clean up of the roof of PS/IS 89 Because of the fine particulate of the dust, ell stones end insulation were removed from the roof to expose the roof membrane. The roof membrane was washed thoroughly of ell dust and debris, end new instsiielion. filter labric and sione were replaced to its state prior to the event. Costs asociated with this work total $68,640.

In sCOition. Corinthian inspected and repaired previously demaoed areas including the membrane, flashings, end pitch pockets. Page £3 of FEMA's Public Assistance Guide slates that -only repairs to disasiet-reieied damage are eligible”. These damages were not e direct resun ot the collapse oi WTC. eno therefore, me inspection ano repair of these damages are not eligible for tunding by FEMA. ineligible costs associaieo with the Inspection ano repair of the pre-existing damages total $3,660.

Total costs incurred fiom seivices provided by CoiHithian is 1300,140.

New York Environmental During the clean-up ©nd remediation project at PS/IS 59, New York Ervironmeniel wes retairred to conduct quality control asbestos project moriitoring ©nd anslylical services. The transmission electron microscopy (TEM) samples were collected in the same locations as the samples being collected by ATC Associsles. These samples were then analyzed by Athenica Environmenlal Services, Inc, Sampling and analysis wg£ performed in accordance to AHERA regulation. Quality control air monitoring and analytical services provided by New York Environmental totaled $3,792.50.

ATC_Asso£iales,_lfi£^ ATC Associstes monitored the clean up activities al PS/IS 89 and, upon satisfactory visual inspection, collected phase contrast microscopy (PCM) following all applicable Federal. State and New York City rules and regulations. A final inspection wes performed using aggressive air sampling in conformance with the methodology of the AHERA Final Rule <40 CFR Part 763). The samples were analyzed for transmission electron microscopy (TEM). V/ork pertormed by ATC total $28,100.

TDX Constructiori Corporation The 1DX Consiructior Corpcrpiion was retained by SCA to pertorrri construction manapement and oversight duties el PS/IS 89 lo COO'Cl'iait t>" COnllHClUr Gul't-t rnCl( iriv proposer scopfr c* won- enc proifessiona. quality. 1 D> wts also rtsponsibie to insure ifisi me v.^ork ptnormec aanereo to applicable tegu.siions. Costs associated with construction management and inspection by TDX totaled $54,273.

PREPARED BY: Daniel Mertin Project Oflicer FEMA Fofm~90-&1A. SEP 98

CITY_21MC100_007213897

NYC-WTC_000359490

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000359490Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

FEMA Project Worksheet · page 2

NYC-WTC_000251589

FEMA project worksheet and paperwork burden disclosure for disaster-related work.

Similarity score 0.980 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411637

FEMA project worksheet for NY disaster with cost estimates and CFR references.

Similar indexed content

NYC-WTC_000243504

FEMA declaration/project worksheet for WTC asbestos regulations and materials.

Similar indexed content

Compare copies and versions →