Re; 90 & 100 Trinity Place
Page - 2 -
6) Provide missing V&R invoice for $1,500
This was sent to you on May 23, 2002 (for duplicate, see Attachment "F")
Requests in the e-mail of 5/30/02
7) V&R invoice US for $1,500: Why was this work needed? It does not appear to be
for routine maintenance.
This pre-existing damage was uncovered during an inspection in the course of the
cleaning work, and the decision was made by the Board of Education to repair it. It was not
a routine maintenance repair.
8) A WL Industries Invoices for $95,929.86 and $111,553.23: This work appears to be
upgrade and routine maintenance repairs.
The AWL work all relates to restoring the indoor air quality (lAQ) of the buildings to pre-
9/11 conditions by providing additional filtration to the air handling units (AHU) at each
school. At 90 Trinity, there are 3 AHUs and at 100 Trinity there are 4 AHUs. As is usually
the case, each unit originally had filters intended to protect the mechanical and electrical
components from any contamination that would cause deterioration and overheating of
machine parts.
In order to restore the lAQ to pre-9/11 conditions so that the schools could reopen, the
original filters and their support racks were replaced to allow the installation of thicker filters
with odor suppression capabilities, and a second set of filters (after filters) with the
appropriate support racks was added. In addition, ductwork for the air intake in the enclosed,
polluted courtyard was extended to the roof level to avoid ground level air contamination.
The installation of the additional filtering media offered additional resistance to the flow of
outside air, so that the systems had to be originally balanced and then re-balanced after the
filters were installed to determine what existing mechanical equipment required
reinforcement or replacement. This work made it possible to reoccupy these schools.
9) Burns & Roe Invoices for $31,248.56: Did this firm have a role in HVAC/duct
cleaning? How do these costs relate to this?
Burns & Roe had no involvement in the cleaning of the HVAC system or duct system.
Its costs relate to the work described in (8) above and not to any cleaning activities. Burns &
Roe acted as the Board of Education's independent consultant in defining the HVAC work
that was required per (8) above, and in providing the scope of work and proper design
protocols for the contractor (AWL) to follow in the field. Burns & Roe was the Board's Project
Manager and followed the day-to-day activities of the HVAC contractor as the work
proceeded to assure proper installation.
CITY_21MC100_011260400
NYC-WTC_000340415
OCR can misread numbers and units. Confirm readings against the page image before using them.