Nappi/Bing June 4, 2002 Re: 90 & 100 Trinity Place Page - 2 -

6) Provide missing V&R invoice for $1,500

This was sent to you on May 23, 2002 (for duplicate, see Attachment "F")

Requests in the e-mail of 5/30/02 7) V&R invoice #8 for $1,500: Why was this work needed? It does not appear to be for routine maintenance.

This pre-existing damage was uncovered during an inspection in the course of the cleaning work, and the decision was made by the Board of Education to repair it. It was not a routine maintenance repair.

8) AWL Industries Invoices for $95,929.86 and $111,553.23: This work appears to be upgrade and routine maintenance repairs.

The AWL work all relates to restoring the indoor air quality (lAQ) of the buildings to pre- 9/1 1 conditions by providing additional filtration to the air handling units (AHU) at each school. At 90 Trinity, there are 3 AHUs and at 100 Trinity there are 4 AHUs. As is usually the case, each unit originally had filters intended to protect the mechanical and electrical components from any contamination that would cause deterioration and overheating of machine parts.

In order to restore the lAQ to pre-9/11 conditions so that the schools could reopen, the original filters and their support racks were replaced to allow the installation of thicker filters with odor suppression capabilities, and a second set of filters (afterfilters) with the appropriate support racks was added. In addition, ductwork for the air intake in the enclosed, polluted courtyard was extended to the roof level to avoid ground level air contamination. The installation of the additional filtering media offered additional resistance to the flow of outside air, so that the systems had to be originally balanced and then re-balanced after the filters were installed to determine what existing mechanical equipment required reinforcement or replacement. This work made it possible to reoccupy these schools.

9) Burns & Roe Invoices for $31,248.56: Did this firm have a role in HVAC/duct cleaning? How do these costs relate to this?

Burns & Roe had no involvement in the cleaning of the HVAC system or duct system. Its costs relate to the work described in (8) above and not to any cleaning activities. Burns & Roe acted as the Board of Education's independent consultant in defining the HVAC work that was required per (8) above, and in providing the scope of work and proper design protocols for the contractor (AWL) to follow in the field. Burns & Roe was the Board's Project Manager and followed the day-to-day activities of the HVAC contractor as the work proceeded to assure proper installation.

CITY_21MC100_011260360

NYC-WTC_000205264

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000205264Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →