NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Invoices, Trinity Trinity Trinity, Aug 2002

Machine-extracted title · confidence 24%

Board of Education invoices for 90 panels analyses and air monitoring through Feb 2002, Aug 2002.

NYC-WTC_000340196
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NEW YORK CITY BOARD OF EDUCATION 90/100 TRINITY PLACE INVOICES

as of August 12, 2002

B Contractor Biiiinajjl Amount Scope F5IVIA PW SSiEligihls

SutmifledJcLQalB Albert Kung_____________ 9,616.00 90 panels analysis NYU-003 $ 9,516.00 Albert Kung 2 1 8,923.20 90 panels and bridging analysis NYU-003 $ 8,923.20 APB Security Systems, Inc. 8531 $ 2,482.50 90 Trinity CCT\' system repair/replace ineligible-Cat. "E’ $ ATC Associates, inc. 1 1 182,768.60 90 air monltoring/analysis through 2/02 NYU-826-DIRECT TO BOE $ 182,768.60 ATC Associates, Inc. 2 $ 87,215 20 100 air monltoring/analysis through 2/02 NYU-808~DIRECT TO BOE $ 87,215.20 ATC Associates, Inc. 7 $ 279,817.25 100 air monitoring/analysis3/02 & 4/02 NYU-807-DIRECT TO BOE $ 279,817.25 ATC Associates, Inc. 8 $ 291,748.75 90 air monitoring/analysis 3/02& 4/02 NYU-825-DIRECT TO BOE $ 291,748.75 ATC Associates, Inc. 11 $ 273,171.00 90 air monitoring/analysis 5/02 & 6/02 NYU-825-DIRECT TO BOE $ 273,171.00 ATC Associates, Inc. 13 $ 259,440.00 100 air monitoring/analysis 5/02S 6/02 NYU-807-DIRECT TO BOE $ 259,440.00 Athenica 118 7,472.00 100 QC air monitoring NYU-004 $ 7,472.00 Athenica 119 $ 3.844.00 90 QC air moritoring NYU-004 $ 3,844.00 NYU-002-525,955.28 (secondary filters) ineligible- AWL Industries, Inc. 16 $ 111.503.23 100 HVAC rehab Cat. J 85,597.95 NYU-002-S9,234.70 (secondary filters) ineligible- AWL Industries, Inc. 17 S 95,929 86 90 HVAC rehab Cat. "E- $ 86,695.16 Board of Education Custodian PO-1 S 253,291.72 90/100 custodial labor/cleaning _________NYU-002_________ s 253,291.72 NYU-002-J5.312.26 ineligible in proportion Io ineligible AWL Burns and Roe 2, 3, 4, 5, 6 5 31,248.56 90 and 100 Trinity HVAC engineering work (17%) $ 25,936,30 Burns and Roe 7, 8 $ 6,749.89 90 and 100 Trinity HVAC engineering ineligible-not 9/11 related $ Business Relocation Services Business Relocation Services 12452 12454 £$ 4,583.57 5,833.03 100 move-in _________ ineligible 90 move-in ineligible A $ Business Relocation Services 23252 $ 5,079.11 100 move-in ineligible Corinthian 1149 s 49,000.00 100 air shaft return cleaning/roinsulation NYU-002 $ 49.000.00 Corinthian 1150 2,867.23 10O secondary cleaning lower aud. roof NYU-001 2,867.23 Doriel Scaffolding 107 $ 4,500.00 90 plywood wall to close sidewalk for probes NYU-003 4,500.00 DSF (work order) 00024866-03 $ 1J4.53 100 control valves hot water system ineligible-Cat. "E" S DSF (work order) 00024866-04 $ 509.63 100 chill waler valve ineligible-Cat "E" $ DSF (work order) 00052472-01 s 1,719.21 1C0 public address system ineligible-Cat. "E" $ DSF (work order) 73613 s 2,112 35 100 plumbing m 12th floor bathroom ineligible-Cat. "E" $ DSF (work order) 00090363-01 $ 7,000.00 90/100 plumbing repairs ineligible -Cat. ’E" $ DSF (work order) 00092514-08 $ 3,291.58 90'100 glass in walkway ineligible-Cat. "E" $ DSF (work order) 00093067-01 $ 1,886.00 100 locks NYU-0O3 $ 1,886.00 DSF (work order) 00093074-01£ 18,144.32 100 locks, doors, door checks ineligible-Cat. "E" $ DSF (work order) 00093195-01£$ 4,932.29 100 door glass / metal sash wiridnws ineligible-Cat. "E“ $ DSF (work order) 00093200-01 1.690.19 90 glass main entrance doors ineligible-Cat. "E" $ DSF (work order) 00093200-03 $ 1,571.01 90 doors, wood floor in gymnasium ineligible-Cat. "E" A DSF (work order) 00093200-04 $ 4,619.47 90 fire hatch at stairway NYU-003 A 4,619.47 DSF (work order) DSF (work order) 00093322-01 00093322-02 £$ 51B.&3 1,432.21 90 interior glazing 90 door checks replacement ineligible-Cat. "E" ineligible-Cat. "E" A $ DSF (work order) 00093322-03 $ 12.24 90 repair locks NYU-003 $ 12.24 DSF (work order for Simplex) 00101279-01 $ 25,647.90 100 repair fire alarm system ineligible-Cat. "E" $ Kiss Construction 19$ 514.561.23 90 interior cleaning NYU-004 $ 514,561.23 Kiss Construction £$ 29 1,084,328.82 100 interior cleaning NYU-004 1,084,328.82 KW Tech KW Tech 03-1001/#! 03-1001/#2$ 32.010.00 5,078-00 100 ductwork insulation replacement 100 additional ductwork insuiation NYU-002 ineligible-maintenance £$ 32,610.00

L. Naro £$ 0017J-00 18,187.41 _________________________ 90 glass in lobby ineligible-Cat. ''E- National Environmental Safety 3704-2001-#1 198,691.00 90 exterior cleaning NYU-001 £ 198,691.00 National Environmental Safety 3705-2001-#1£$ 204,800.00 ______________________ 100 exterior cleaning _________ NUFQOI_________ 5 204,800.00 National Environmental Safety 3705-2001-#2 3704/5-2001-#1 £ 51,200.00 100 exterior cleaning _________ NYU-001_________ £ 51,200.00 National Environmental Safety 3704/5-2001-#2 $ 28,175.00 ___________________ 90/100 sidewalk bridging _________ NYU-Q01_________ £ 28,175.00 National Environmental Safety 3704/5-2001-#lR £ 10,225.00 90/100 sidewalk bridging _________ NYU-001_________ £ 10,225.00 National Environmental Safety D0055356 $ 1,481.22 _______ 90/100 sidewalk bridging 16-day rental _________ NYU-0Q1_________ £ 1,481.22 Safway Steel Products 2041 s 82,252.50 90 sidewalk bridae (for panels) (75% billed) NYU-003 £ 82,252 50 Stance Electric 2049 $ 1,031.58 90 bridge lighting _________ NYU-003________ £ 1,031.56 Stance Electric 2060 $ 717 16 100 restore functioning of exhaust fans 9th floor ineligible-Cat. 'E- £ Slanco Electric Stance Electric 2073 $ 1,116.40 S32.45 10O restore functioning of fan shutdown relays inehglble-Cat. "E“ ________________________ IQQ bridge lighting _________ NYU-003________ £$ 632.45 Stanco Electric 2074 £ 903.96 100 bridge Itg. trouble-shoot breaker S remedy _________ NYU-Q03________ 903.96 Stance Electric 2089 $ 2099 £ 596.52 90 bridge lighting _________ NYU-QQ3_________ £ 596.52 Stanco Electric 2128 $ 847.62 _______________________ 100 bridge lighting _________ NYU-003_________ £ 847.82 Stanco Electric 2137 £ 60B.1B _________________________ 90 bridge lighting ________ NYU-Q03_________ £ 6U8.ia Stanco Electric 129 £ 471.02 100 bridge lighting emergency response _________ NYU-003_________ £ 471.02 Taylor Environmental 132 $ 30,928.00 90 air sampling ________ NYU-004_________ £ 30,928.00 Taylor Environmental Taylor Environmental 139 $ 32,465.00 43,873.00 __________________________ 100 air sampling ________ NYU-004________ 100 air sampling _________ NYU-004________ £$ 32,465.00 43,873.00 NYU-001. -002. -003-S696.37 ineligible (tee or\ly) duo to 149, 167,176,182 $17,411.62 ineligible TDX 199,207,226.257 £ 153,225.54 _________ 90/100 CM services (fee and staffing) subcontractor costs A 152,529.17 Trio Asbestos 2? £ 666,946.07 1QQ interior clean-up _________ NYU-004________ A 666,946.07 Urban D.C. Inc. 6681 £ 225,225.75 ________________ 90 panels repair (21 panels) _________ NYU-Q03________ A 225,225.75 V&R Mechanical £ 420,000.00 ___________________ 100 HVAC duct cleaning _________ NYU-002________ A 420,000,00 V&R Mechanical V&R Mechanical 8 (change order) £ 18 (change order) £ 1,500.00 566.00 __________ IQQ damaged ductwork at 6th floor _________ NYU-0Q7________ 100 fresh air intake grille coverings/filters _________NYU-002________ A 1,500.00

V&R Mechanical 19 (change order) $ 5,049.00 100 Clean mixing boxes after new dampers _________ NYU-OQ2_________ A 966.00

20 (change order) $ A 5.049.00 V&R Mechanical 1,5.30.00 100 clean mixing boxes (plenums) NYU-002 $ 1,530.00 100 reclean floors 3,5,7,9,10, basement; inspect V&R Mechanical 56 (change order) £ 205,710.00 ___________________ HVAC entire building: etc. 11581 $ NYU-002 A 205,710,00 VSR Mechanical 398,000.00 90 HVAC duct cleaning NYU-002 $ 396,000,00 NYU-002-$/P,500 (metal flex) VSR Mechanical 1 (Change orders) 16,250 00 90 clean mecli. room / replace metal flex ineligible-Cat. "E” $ 5,750,00 Warren & Panzer Engineering 138 $ 3,950 00 ______ asDestos monitoring @ 90 Trinity _________ NYU-004________ s 3.950.00

GRAND TOTAL $ 6,496,470.09 $ 6,326,260.36 s 170,209.72

CI TY__2 IMC10 0_0 0 9 2 7 9 3 9 2

NYC-WTC_000340196

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000340196Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Invoice summary, 90 Trinity Place

NYC-WTC_000359591

Invoicing from multiple vendors for 90 Trinity CCTV, panel analyses, and air monitoring services.

Similar indexed content

Invoices, 90/ Trinity, Aug 2002

NYC-WTC_000340191

Board of Education invoices for air monitoring and related analyses at Trinity facilities, Aug 2002.

Similar indexed content

Compare copies and versions →