NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Breakdown of Approved Change Orders
Document / 2 pages

Breakdown of approved change orders, OEM project, Feb 17, 1999

Machine-extracted title · confidence 90%

Financial breakdown of approved change orders for the Mayor's Office of Emergency Management, including costs for ductwork and electrical changes.

NYC-WTC_000173949–000173950

Folder label: “Breakdown of Approved Change Orders

Page image
Scanned page image, NYC-WTC_000173950
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

37 F&l stainless steel cladding to 20 existing window mullions 40166 $0.00 VOfD $0.00 38 Additional drains as per SKP 3 and SKP 4 in HC toilet rooms 23-3 & 23-32 $8,346.00 1/25/99 $7,000.00 Approved $7,000 39R Mobile PBF 15’Wx 17 3/4" D LN Novalink furniture not included in base bid $26,391.00 12/29/98 $26,391.00 Approved $26,391.00 40 Chop concrete and weld new rebar to existing rebar in trench w/3" overlap $26,427.00 1/25/99 $21,300.00 Approved $21,300.00 41 Antenna support per revised sketch from Cantor adding 4 steel clips welded to web $16,807.00 1/25/99 $14,500.00 Approved $14,500.00 42 F&l 4 type G wall washers in room #23-40 as per FSK-51 $2,202.00 1500 offered $2,202.00 43 RG-6U plenum cable for Time & Warner TV as per John Hughes letter $11,759.00 1/25/99 $11,000.00 Approved $11,000.00 44 F&l oil piping as per SHC sketch dated 12/14/98 revised routing $35,000.00 to be revised $35,000.00 • 45 F&l 1 custom press panel & installation & termination of cables in to it $1,430.00 12/29/98 $1,430.00 Approved $1,430.00 46 Additional electrical work in room 23-50 and 23-18 lor power supply/sequrity equip $2,168.00 1800 offered $2,168.00 47 Furnish 3 stainless steel flexes for the generators $3,941.00 1/4/99 $3,941.00 Approved $3,941.00 _ 48 Additional work as per Swanke memo dated12/29/&8 $4,679.00 1/25/99 $4,679.00 Approved $4,679.00 ■ 49 Change ceiling tile & sprinklers in press room $6,779.00 5600 offered $6,779.00 50 Correct incompatability between Ace video equip & Lutron dimming system $1,067.00 1/25/99 $1,067.00 Approved $1,067.00 51 Various changes in storage room shelving units $751.00 1/25/99 $751.00 Approved $751.00 52 Various electrical changes as per RB Samuel's work orders $38,987.00 34439 offered $38,987.00 53 Various electrical changes as per RB Samuel's work orders $2,898.00 2197 offered $2,898.00 54 Man hour cost for moving computer equipments on 23rd floor $2,671.00 2249 offered $2,671.00 55 Removal /reinstallation of electrical work due to new routing of fuel line $34,954.00 28000 offered $34,954.00 56 1 duplex outlet on 1 st floor with cable in 1" conduit 19242 $0.00 VOID $0.00 57 Additional equipment & labour for security work as per SHCA memo dated 12/17/98 $68,613.00 59644 offered $68,613.00 58 Labour for moving computer equipments $5,506.00 4938 offered $5,506.00 59 1 duplex outlet on 1st floor w/wiring through existing 4" conduit $10,948.00 to be approved $10,948.00 60 Close gap at steel in hurricane wall w/16 gauge steel plate as per FSK-54 $8,114.00 to be approved $8,114.00 61 Mag lock over ride button for doors at toilet rooms, water storage room,bunker rooms and door leading to bunker room area $2,785.00 2400 offered $2,785.00 62 Roof repair as per details at new curb from Kemper system $9,679.00 to be approved $9,679.00 63 Additional electrical work as per RB Samuels work orders $1,912.00 1617 offered $1,912.00 64 Additional electrical work as per RB Samuels work orders $7,114.00 6169 offered $7,114.00 65 X-Ray machine and badging system $26,336.00 $22,721.00 Approved $22,721.00 66 Press room floor and podium $15,460.00 14766 offered $15,460.00 67 Various electrical changes as per RB Samuel's work orders $2,894.00 to be reviewed $2,894.00 68 F&l astragal on door #5 ACME pair of doors $406.00 to be reviewed $406.00

Total $851,348.00 $465,741.00 $724,831.00

* DCAS estimated cost

NYC-WTC_000173950

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173950Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Breakdown of approved work costs, MOEM, July 1999 · Box 7DCAS

NYC-WTC_000172947

Document dated July 12, 1999 listing approved change orders and costs for construction work at the Mayor's Office of Emergency Management in 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.979

machine-extracted · confidence unavailable · Check page ↗
MOEM approved work breakdown, June 1999 · Box 7DCAS

NYC-WTC_000172970

Document listing approved costs for ductwork, electrical changes, and hurricane wall construction at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.971

machine-extracted · confidence unavailable · Check page ↗
Breakdown of approved construction costs, April 2002 · Box 7DCAS

NYC-WTC_000171286

Document dated April 12, 2002 listing approved costs for various construction items including wall relocation and hurricane wall work at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.963

machine-extracted · confidence unavailable · Check page ↗
OEM breakdown of approved change orders, Nov 1998 · Box 7DCAS

NYC-WTC_000173552

Itemized list of approved change orders for the Mayor's Office of Emergency Management at 7 World Trade Center, including costs and approval dates.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959

machine-extracted · confidence unavailable · Check page ↗
OEM budget breakdown for 7 WTC project, November 1998 · Box 7DCAS

NYC-WTC_000173554

Budget accounting document detailing construction costs, revised budgets, and change order approvals for the Mayor's Office of Emergency Management at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.954

machine-extracted · confidence unavailable · Check page ↗
OEM breakdown of approved change orders, Nov 1998 · Box 7DCAS

NYC-WTC_000173550

Itemized list of approved change orders for the Mayor's Office of Emergency Management at 7 World Trade Center, including costs and approval dates.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →