NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Settled dust bulk sampling results, Sept 2001

Machine-extracted title · confidence 28%

Bulk sampling results and remarks for various floor areas.

NYC-WTC_000332087
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

INNFflX'SERUICE. P. 1

ZAR REALTY 100 CHURCH STREET NEWYORK»NY SETTLED DUST BULK SAMPLING RESULTS

September 28,2C01 FLOOR/ #OF AREAS NEEDING SQUARE FEET LEVEL BUr^KS ASBESTOS CLEANUP OF AREA (SF) REMARKS Sub-Cellar (5 Area Not Accessible. No samples NA Level Flooded Teniir ■p 12 Engine room and all areas with dust 30,000 Dept of Labor (South West side) 4, SEE Lobby Area @ Front Entrance 2,000 Mozzanine I South west Comer 4,000 ■yw — 24 NO WORK ON THIS FLOOR ITT All samples negative ■yro 19 NO WORK ON THIS FLOOR NA AII samples negative I?" No WORK ON niiS RLQ6R RT All samples negative ■5™ 19 T^owoRlC5inHisTC5oR NA All samples negative 6™ 19 North feast Side 2,000 yn 12 Entire Office Space of Floor MBR-Fresh airhitakcTlenum 1,300 Including all filters S'" 18 East Side of Floor ——— "8,(500 North East Comer 4,000 18 NO WORK ON THIS FLOOR NA All samples negative To™’ 10 Sooth West Comer “IW TT™" 12 South West Comer 2,000 T5™' 10 South West Corner 6,000 TT™" IT South Ea<it Side of Coro Area 2,000 Piro Door w/ACM 15™' 12 NO WORK ON fhrS FLOOR NA Allsamples negative 1^ IT South Central Side of Core Area TW 'Fire Door w/ACM It™" TT NO WoRk ON THIS floor “KT All samples negative I io 4X1” a:anmnsmEro 15™“ 17 Sooth West Side 2,500 Two locations IS™” IT South West Side XW East Side 3,000 21- Fenthouse 8 Rest Rvorn>North West Comer 250 MBRs 19 Abandoned Unit (DC-2) 100 Remaining arew of the (East and East and West Fan West side) RoofflS-ttll samples negative Roof} 5 All exposed horizontal surfaces and Roof Areas; 54,000 Based on footprint of (20'^ and all exterior ledges on facade. Also building and all above) all roof entrances into building. Facades: 230,000 facades. TOTALS: 314 Interior'; 111,650 Roof Areas: 54,000 gacfldes; 230.000 GRAND TOTAL: 405.650

NOTISS: 1. Quantity of affected areas per area per floor to be cleaned is approximate. Final determination to be made in field with Engineer. 2. Ah filters In all Air Handling equipment are to be removed and diBpCBed as contaminated debris, Coordinate with Building Engineer for exact locations of units. 3. All other areas of respective floors, in which bulk samples tested negative for the presence of asbestos, cleanup can proceed as non-asbestos project. 4. On floors wltli non-ACM and ACM areas coordinate with Building Management. Recommend that all ACM cleanups be completed prior to general cleanup.

211334

P0 39Vd HONvas G8EZE9STE9 SaiST T002/ET/TT

CITY_DEP_WORBY_CANNATA_SUBP_000035114

NYC-WTC_000332087

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000332087Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000362379

Bulk sampling results for settled dust on multiple building levels.

Similar indexed content

NYC-WTC_000268577

Dust bulk sampling results for asbestos at 100 Church Street settlment areas, Sept 2001.

Similar indexed content

Compare copies and versions →