NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 64 pages

EPA background report, WTC air contaminants, 1987

Machine-extracted title · confidence 29%

Background report on asbestos and related contaminants for WTC environment, 1987.

NYC-WTC_000318755–000318818
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

g 1534S Federal Register / Vol. 52, No. 83 / Thursday, April 30, 1987 / Proposed Rules

Selected Silicate Minerals and Their Asbestiform Varieties flow before reorienting the cassette downward. Note the condition of the Mineral AsbesWorm variety filter at the conclusion of sampling.

r Amphibole group 12. Double check to see that all information has been recorded on the AnthophylBte: (Mg.Fe-bSi.CfeiOH.F),________ Anthophyllite asbestos. data collection forms and that the Cummingtonitthgrunerile; (Mg.Fe»-),Si.O„(OH),.. Cwmminglonrto-gnjnerite asbestos. Tremolite-actinolite: Caj(Ma,Fe”'|.S.On(OH,F),.. Tremolite-actinolite asbetos. cassette is securely closed and Biebecltite: Na,Fo,Fo,’•Si.OulOH.F),................. Croddofite. appropriately labeled before shipment. 1’ Serpentine group

Chrysotile. 13. Do not change containers or take portions of these filters for other Serpentine: W9*Sj40,o(OH}, purposes. . F. Abatement area sampling. ■ * I 1. Conduct final clearance sampling only .1! I. Sampling between cassette part joints. A after the primary containment barriers mechanical press may be useful to have been removed, the abatement area A. Sampling operations must be has been thoroughly dried and it has perforntied by qualified individuals achieve a reproducible leak-free seal. completely independent of the 9. Use wrinkle-free loaded cassettes in passed visual inspection tests. Note the the sampling operation. final plastic barrier remains in place for abatement contractor to avoid possible the sampling period. (Ref. 1) conflict of interest (References 1-3, 5). E. Sampling. 1. Calibrate the sampling pump over.the range of flow rates and 2. Containment barriers over Special precautions must be taken to loads anticipated for the study with its windows, doors, and air passageways avoid contamination of the sample. For example, do not use materials that have flow measuring device in series. Perform must remain in place until the TEM i!' this calibration using guidance from - clearance sampling and analysis is not been prescreened for their asbestos EPA Method 2A each time the unit is completed and results meet clearance background content; also, do not use sent to the field (Ref. 6). test criteria. ;V sample handling procedures which do not take cross contamination 2. Configure the sampling system to 3. Collect five samples per abatement preclude pump vibrations from being area to compare to the five ambient

I fl i possibilities into account. • B. Material and supply checks must be transmitted to the cassette by using a ' made on all critical supplies and reagents before their use in a monitoring study. sampling stand separate from the pump station and making flexible tubing. connections with

3. Maintain constant flow conditions ’ sample. samples. 4. Select sampling sites in the abatement area on a random basis to provide an unbiased and representative C. Quality control and quality / , assurance steps are mandatory to by damping out any pump action 5. Take a field blank at each identify problem areas and isolate the fluctuations. abatement area before sampling is 4. Check the sampling system for initiated by removing the cap for not e cause of the contamination (Ref. 5). Control checks shall be permanently recorded to document the quality of the leaks with the end cap still in place and the pump before initiating sample more than 30 seconds and replacing it at the time of sampling. (Do not leave the information produced. collection. Trace and stop the source of blank open during the sampling period.) D. Sampling medium. 1. Sample for any flow indicated by the flowmeter 6- Cany a sealed blank with each airborne asbestos following an under these conditions. sample set. This representative cassette abatement action using a three-piece 5. Select an appropriate flow rate is not to be opened in the field. cassette available commercially in 25 equal to or less than 10 L/min for 25 mm 7. Use aggressive sampling conditions mm, 37 mm, or 47 mm diameter sizes. cassettes. Larger filters may be operated to dislodge any remaining dust. 2. Use either a cowling or a filter­ at proportionally higher flow rates. a. Negative filtration units shall retaining middle piece made of a 6. Orient the cassette downward at remain on during the air monitoring conductive material to minimize approximately 45 degrees. period. possible static charge effects on the 7. Maintain a log of all pertinent b. Prior to air monitoring, floors, sample. sampling information, such as pump ceiling and walls shall be swept with the 3. Load cassettes with filters from identification number, calibration data, exhaust of a 1 horsepower leaf blower. stock lots that have been sampled and sample location, date, sample c. Stationary fans are placed on two- found to meet background asbestos identification number, flow rates at the meter high stands in locations which content as specified by this TEM beginning, middle, and end, start and . will not interfere with air monitoring analysis method. stop times, and other useful information equipment Fan air is directed at ceiling 4. Use sample collection filters which or comments. and is operated at low speed. One fan are either polycarbonate or mixed 8. Initiate a chain of custody shall be used for each 10,000 cubic feet i cellulose ester having a pore size of 0.45 procedure at the start of each sampling, of worksite. 11 jLtm or less. if this is requested by the client. 8. Pump flow rates up to 10 L/min may I 5. Place these filters in series with a 9. Maintain a close check of all be used for 25 mm cassettes. The larger 5.0 ^m backup filter and cellulosic aspects of the sampling operation. cassette diameters may have 1 L*’.. support pad. 6. When polycarbonate filters are used, position the highly reflective face 10. Continue sampling until at least the minimum volume to obtain the desired quantitation limits (see Table I), comparably increased flow. 9. Sample a volume of air sufficient to ensure the minimum quantitation limits. such that the incoming particulate is is collected. Do not exceed the See Table I. received on this siu-face. maximum volumes described in Table II. G. Ambient sampling, 1. Site ambient 7. Assemble the cassettes in a clean 11. At the conclusion of sampling, turn samplers at locations representative of I facility (see Definitions). the cassette upward before stopping the the air entering the abatement site. If 8. Seal the cassettes to prevent flow to minimize possible particle loss. makeup air entering the abatement site leakage around the filter edges or If the sampling is resumed, restart the is drawn from another area of the • i.

NYC-WTC_000318782

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000318782Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →