NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 64 pages

EPA background report, WTC air contaminants, 1987

Machine-extracted title · confidence 29%

Background report on asbestos and related contaminants for WTC environment, 1987.

NYC-WTC_000318755–000318818
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Federal Register / Vol. .52, No. 83 / Thursday, April 30, 1987 / Proposed Rules 13645

However, an accredited inspector shall effect, with his or her State of asbestos concentration represented assess the friable ACBM under § 763.88, accreditation and if applicable, by each fiber counted under the (2) An accredited inspector has accreditation number and, within 30 electron microscope. It is determined determined that, based on sampling days of such determination, submit a by the air volume collected and the records, non-friable ACBM was copy of the statement to the person proportion of the filter examined. This identified in that area during an designated under § 763.83 for inclusion method requires that the analytical inspection conducted before the in the management plan. However, an sensitivity be no greater than 0.005 f/ effective date of this Subpart E. The accredited inspector shall identify cm^*. inspector shall sign and date a whether material that was non-friable statement to that effect with his or her "Asbestiform”—A specific type of suspected ACBM assumed to be ACM State of accreditation and if applicable, mineral fibrosity in which the fibers has become friable since the previous accreditation number and. within 30 inspection and shall assess the newly and fibrils possess high tensile days after such determination, submit a friable material and previously strength and flexibility. copy of the statement to the person identified friable suspected ACBM “Aspect ratio”-rA relative comparison designated under § 763.83 for inclusion assumed to be ACM under § 763.88. of the length to the width of a particle. in the management plan. However, an (6) Based on inspection records and “Clean area”—A controlled accredited inspector shall identify contractor and clearance records, an environment which is maintained and whether material that was non-friable accredited inspector has determined monitored to assure a low probability has become friable since that previous that no ACBM is present in the area. of asbestos contamination to inspection and shall assess the newly- . where asbestos removal operations materials in that space. Clean areas friable ACBM under § 763.88. have been conducted before the used in this method have HEPA .(3J Based on sampling records and effective date of this Subpart E and shall filtered air under positive pressure . inspection records, an accredited sign and date a statement to that effect and are capable of sustained inspector has determined that no ACBM and include his or her State of operation with an open laboratory is present in the area and the records accreditation and, if applicable, blank which on subsequent analysis show that the area was sampled, before accreditation number. The local the effective date of this Subpart E, in has an average of <0.5 fibers per 10 education agency shall submit a copy of grid openings and seldom more than 3 substantial compliance with § 763.85(a), , . the statement to the EPA Regional which for purposes of this section means Office and shall include the statement in fibers for that same'area. in a random manner and with a the management plan for that school. “EDXA”—Energy dispersive X-ray sufficient number of samples to (7) An architect or project engineer - analysis. reasonably ensure that the area is not responsible for the construction of a "Fiber”—A structure >0.5 micrometers ACBM. new school building built after October in length with an aspect ratio (length (i) The accredited inspector shall sign 12,1988, or an accredited inspector signs to width) of 5 to 1 or greater and and date a statement, with his or her a statement that no ACBM was ’ having substantially parallel sides. _ State of accreditation and if applicable, specified aS a building material in any "Grid”—An open structure for mounting accreditation number that the area construction document for the building, determined not to be ACBM was on the sample to aid in its or, to the best of his or her knowledge, examination in the TEM. The term is sampled in substantial compliance with no ACBM was used as a building § 763.85(a). used here to denote a 200-mesh material in the building. The local copper lattice approximately 3 mmi in. (ii) Within 30 days after the education agency shall submit a copy of inspector’s determination, the local . the signed statement of the architect, diameter. education agency shall submit a copy of project engineer, or accredited inspector "Laboratory sample coordinator”—That the inspector’s statement to the EPA to the EPA Regional Office and shall person responsible for the conduct of -1 Regional Office and shall include the include the statement in the sample handling and the certification statement in the management plan for management plan for that school. of the testing procedures. that school. (b) The exclusion, under paragraphs "Limit of quantitation”—Defined as four (4) The lead agency responsible for (a) (1) through (4) of this section, from . times the analytical sensitivity of this asbestos inspection in a State that has conducting the inspection under method. been granted a waiver from § 763.85(a) § 763.85(a) shall apply only to areas of a has determined that, based on sampling school building that were inspected and . "Operator”—A person responsible for records and Inspection records, no sampled before October 17,1987. The the ’TEM instrumental analysis of the ACBM is present in the area and the local education agency shall conduct an sample. records show that.the area was sampled inspection under § 763.85(a) of all areas "PCM”—Phase contrast microscopy. before the effective date of this Subpart inspected before October 17,1987, that “SAED”—Selected area electron E in substantial compliance with were not sampled or were not assumed diffraction, - § 763.85(a). Such determination shall be to be ACM. included in the management plan for "SEM"—Scanning electron microscope, that school. Appendix A to Subpart E—Interim "STEM”—Scanning transmission (5) An accredited inspector has Transmission Electron Microscopy electron microscope. determined that, based on records of an Analytical Method and Field Sampling inspection conducted before the Protocol for the Clearance Testing of an “Structure”—A microscopic bundle, effective date of this Subpart E, Abatement Site cluster, fiber, or matrix which may ' suspected ACBM identified in that area „ ... ,„ contain asbestos. is assumed to be ACM. The inspector Definttiona of Terms “TEM”—Transmission electron shall sign and date a statement to that "Analytical sensitivity’’—Airborne microscope.

NYC-WTC_000318781

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000318781Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →