NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 38 pages

NYC-WTC_000219925

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000219925–000219962
Page image
Scanned page image, NYC-WTC_000219927
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Search - 1 Result - APPENDIX A TO SUBPART E - INTERIM TRANSMISSION ELEC...Page 3 of 38

23. S/mm<2> — Structures per square millimeter.

24. TEM - Transmission electron microscope.

B. Sampling

1. The sampling agency must have written quality control procedures and documents which verify compliance.

2. Sampling operations must be performed by qualified individuals completely independent of the abatement contractor to avoid possible conflict of interest (References 1, 2, 3, and 5 of Unit II.J.).

3. Sampling for airborne asbestos following an abatement action must use commercially available cassettes.

4. Prescreen the loaded cassette collection filters to assure that they do not contain concentrations of asbestos which may interfere with the analysis of the sample. A filter blank average of less than 18 s/mm<2> in an area of 0.057 mm<2> (nominally 10 200-mesh grid openings) and a single preparation with a maximum of 53 s/mm<2> for that same area is acceptable for this method.

5. Use sample collection filters which are either polycarbonate having a pore size less than or equal to 0.4 am or mixed cellulose ester having a pore size less than or equal to 0.45 am.

6. Place these filters in series with a 5.0 mum backup filter (to serve as a diffuser) and a support pad. See the following Figure 1:

♦ Display Image

7. Reloading of used cassettes is not permitted.

8. Orient the cassette downward at approximately 45 degrees from the horizontal.

9. Maintain a log of all pertinent sampling information.

10. Calibrate sampling pumps and their flow indicators over the range of their intended use with a recognized standard. Assemble the sampling system with a representative filter (not the filter which will be used in sampling) before and after the sampling operation.

11. Record all calibration information.

12. Ensure that the mechanical vibrations from the pump will be minimized to prevent transferral of vibration to the cassette.

13. Ensure that a continuous smooth flow of negative pressure is delivered by the pump by damping out any pump action fluctuations if necessary.

14. The final plastic barrier around the abatement area remains in place for the sampling period.

15. After the area has passed a thorough visual inspection, use aggressive sampling conditions to dislodge any remaining dust. (See suggested protocol in Unit III.B.7.d.)

http;//lexis/researeh/retrieve?_m=el35f2ca3d266867e53d261df3205722&_fmtstr=FULL6... 02/04/2002

CITY_21MC100_012558667

NYC-WTC_000219927

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000219927Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →