Meeting minutes, WTC EH&S transition, Apr 2002

Machine-extracted title · confidence 51%

Minutes discussing EH&S close-out criteria for WTC site transition to Port Authority.

NYC-WTC_000317559–000317561
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

* Safety Transition Issues Page 2 Minutes-4/17/2002

close-out inspections should commence towards the later part of May. As a reference, Mark Jakubek indicated he would be sending to the DDC an environmental clearance memo that the PA Engineering Dept, uses on their projects.

3. Currently, a small amount of ACM is still present in portions of 6 WTC, and mold has been observed to be present in a subgrade stairwell in 4 WTC, and in a fornier storage room in 5 WTC. At this point, the DDC has no plans to abate the asbestos in 6 WTC, and Liberty Mutual, with the NYC DOH, will be performing air monitoring for mold, and shall collect samples for species identification. A course of action has not yet been planned to address the mold issue.

The DDC will contact FEMA to see if the ACM in 6 WTC and the mold in 5 WTC can be abated using FEMA funds. The DDC is requesting from the Port Authority what there position is regarding this issue.

4. An agreement between the NYC DDC and the PA must be reached as to what the PA will require in accepting the site back from the DDC. Will the PA require soil testing, debris sampling, abatement in 6 WTC, mold removal in 4 WTC, air sampling, EH&S Close-out Checklist sign-off, or a combination of each?

It was again noted that at the completion of this project, the World Trade Center site shall be cleared of all debris.

5. Mark Jakubek stated that the PA Engineering Dept, will be reviewing the environmental air monitoring provided to them by the U.S. EPA. At that time, the PA will decide if continued air monitoring is required during restoration work.

If the PA is going to use the EPA data in this manner, then the DDC will require the PA to sign-off on the EPA data, accepting it as an historical representation.

6. As it relates to the continuation of environmental air monitoring during restoration work, the following scenarios were discussed:

• The PA could opt to use the EPA’s historical air monitoring data, the EH&S Close­ out Checklist, the FDNY grid assessment, and request that the EPA collect a "final" air sample to verify that the site is clean. If done, air monitoring required during normal construction projects is all that will be required.

• The PA will continue to collect air samples as part of a community out-reach campaign, or recognized hazards associated with their work.

The DDC is requesting that the PA inform them as to what the PA's intentions are regarding the continuation of environmental air monitoring.

• The NYC OEM could decide that air monitoring needs to continue, and request the PA to take over existing monitoring or set-up separate, but similar, programs.

CITY_21MC100_008956852

NYC-WTC_000317560

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000317560Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →