(19) Upon successful visual inspection, the work area shall be isolated from the remainder of the
work site pending clearance air monitoring. Clearance air monitoring shall be performed after
completion of all clean up activities at the work site.
(20) The Air Sampling Technician shall perform air sampling after the area is free of dust
accumulations as determined by the Project Monitor. The apartment will be re-cleaned and
retested if the air monitoring clearance criteria are not achieved. The clearance air monitoring
criteria have been established by the USEPA for this clean up activity (WTC vicinity). The
monitoring contractor shall also collect wipe samples for metals. Refer to the monitoring
specification for additional information.
(21) After successful clearance air monitoring, isolation barriers shall be removed in accordance with
the applicable requirements of Title 15, Chapter 1 of the RCNY.
(22) The cleaning contractor is not responsible for damage or loss caused by the acts of parties not
involved with the cleanup. Tenant shall be responsible for the removal of any valuables. If such
removal is not feasible, the tenant shall notify the Project Monitor in writing (including original
receipt, formal appraisal, or estimated value) as to the location, description and value of said
item.
(23) Disposal of all waste generated during the cleaning shall be the responsibility of the contractor.
All waste generated shall be treated as asbestos-containing material (ACM) unless otherwise
indicated herein. Transportation and disposal of generated waste shall be in compliance with all
applicable rules and regulations.
(24) All work shall be in compliance with all other applicable requirements of Title 15, Chapter 1 of
the RCNY.
(25) Visible mold has been verified in apartments 6N, 5N, 4N, 3N and 2N. The contractor shall cut
and remove all portions of sheet rock with the presence of mold. The abatement contractor shall
not be responsible for repair or replacement of removed sheet rock. For other surfaces, the
cleaning contractor shall perform necessary remediation with additional guidance from NYC
DEP and NYC DOH. Staff experienced in mold remediation is required. The contractor may
subcontract this portion of the work.
(26) The following table contains special conditions and handling instructions for items in specific
units. Items not specifically referenced in this table shall be cleaned in accordance with the
procedures specified in this scope of work.