DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

phosphorous. Engineer will submit additional information. Received letter from Town Supervisor on 9/21/00. This letter proposes to have the Town of Windham withdraw from the Block Grant Program Structure due to delays finalizing the Final Design Contract. The Town desires to return to the original program format. Correspondence issued 9/5/00 presents DEP position on funding phosphorous Removal and tertiary sand filtration to be incorporated into the O&M Agreement. A meeting was held on 7/19/01 to review the project status with the engineer and to discuss the purchase of a different site, from what was originally agreed upon. DEP awaits for the submission of an application with design. SEQRA Type 1 - The Town of Windham declared themselves as Lead Agency on 6/24/98.

Town: Windham Drainage Basin: Schoharie Reservoir Project Name: Windham Theater, (Log #5317) Project Description: Proposal to re-open existing theater; existing SSTS. Proposed concession and mini golf course at the existing theater. Status: On 16/1/97, DEP received a copy of a letter addressed to the NYSDOH from the engineer regarding re-opening the Theater. DEP contacted the NYSDOH and was informed that the existing SSTS will not be an issue in re-opening the business. On 10/23/97, DEP sent a letter to the engineer indicating that DEP had no objection to the re-opening prior to 5/1/98 pursuant to the WR&R. DEP received a telephone call inquiry from the applicant regarding requirements foi adding a concession to the movie theater and clearing of land and placement of a seasonal (removable) mini golf course. DEP conducted site visit on 5/21/98; DEP met with the applicant and engineer on 6/2/98 for a Pre-Application Conference to discuss the adequacy of the existing SSTS and if it can accommodate the additional flow from the proposed concession and mini go! course. DEP witnessed the deep hole and percolation tests on 7/7/98. DEP received project proposal on 8/17/98; issued request for plan to show SSTS reserve area and issued NICA on 8/19/98; received revised plan on 8/24/98 and SEQRA Negative Declaration prepared by Town (Lead Agency) on 8/26/98; issued NOCA on 8/28/98; issued comment letter to engineer on 9/1/98. Lead Agency issued determination of Negative Declaration in 10/98; DEP received revised plans on 10/1/98 and sent comment letter requesting location of reserve area for WWTS issued Request for Extension of Review and Approval Time on 10/8/98; issued Design Approval on 10/21/98. DEP met with Theater owner and consultant on 2/3/00 to discuss the proposed building addition. A Caboose was found on the property. DEP cunently investigatin. whether or not the Caboose is an impervious surface within 100 feet separation distance of a watercourse/ Batavia Kill. Caboose was moved to within 100 feet of watercourse, owner directed to move outside separation distance. Construction began 4/29/00. DEP notified of a us modification. Review Letter issued 5/30/00. Re-submittal received 6/21/00. Review Comments scheduled to be delivered 7/9/00. Review Comments issued 7/11/00. Correspondence from attorney representing applicant received by fax on 8/3/00. Additional correspondence received by DEP on 8/8/00 and 8/21/00 from the Engineering Consultant and Legal Council for the Applicant. DEP requested additional information in a letter dated 8/29/0 The issue is a modification to the proposed use of the building addition from that approved 10/21/98. Correspondence received from the Applicants Engineering Consultant on 9/5/00. Meeting with DEP Legal, Engineer and Applicant took place in Kingston 9/22/00. Project remains at an impass due to the application of the non-complying regulated activity requirements in the WR&R. DEP determination approved project on 11/3/00. SSTS will include a Zabel Filter to treat bakery waste water. Construction scheduled for SSTS 11/8/00. Engineer construction certification received 11/22/00. Engineers certification received 11/22/( and Construction certification issued by DEP 12/13/00. DEP issued a letter to the owner on

24 NYC-WTC_000291050

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291050Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Permit application, Education Dept. · page 88

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.929 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →