DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Status; DEP met with the Green County Soil and Water Conservation District (District) on site in (3 Windham 12/18/98. The District is proposing a holding tank to replace an existing incinerat toilet while they wait for the New Infrastructure Program to construct a WWTP which they would like to pump to. However, the Transfer Station is located outside the approved wastewater service area. DEP requested the District contact the Town of Windham to resoh this issue. DEP issued a NICA on 12/30/98. They were denied the permanent holding tank all other options were explored. Recently the Town of Windham agreed to allow the Transft Station to tie into the proposed sewer when it is constructed. DEP met on site with the appli on 5/30/01, and requested the submittal of a current application and current plans for the des: of a temporary holding tank. DEP is currently waiting for a current SSTS application, short EAF, and proof of proposed sewer hook up, in order to continue review of this project. On 7/5/01 a NOCA was issued. The Approval letter is due before 8/17/01 and is currently waiti: for proof of contractor pump schedule. The approval letter was issued on 8/17/01 with a stipulation that the pump out schedule must be signed by Greene County before construction begin. SEQRA Type II - Repair of existing structure.

Town; Windham Drainage Basin; Schoharie Reservoir Project Name: Windham/ Hensonville Proposed WWTP, (Log #3617) Proj ect Description; Proposed WWTP; MOA Program 122 Area #3. Status; DEP received the Town’s intent to declare itself as Lead Agent on 4/16/98; project has not b( SEQRA typed yet; Town is prepared to issue a Positive Declaration on the project which wil require an EIS. DEP responded on 4/24/98 with the acceptance of the Town as Lead Agent. I 6/98, Town declared project a SEQRA Unlisted Action; DEIS will be prepared. DEP comph review of the Task 2 flow report on 6/11/98; issued comment letter on 6/16/98; met with engineer on 6/24/ and 7/1/98 to discuss DEP comments and various technical issues. DEP m( also with the Town and its attorney on 6/29/98 to discuss the boundaries of the proposed sew service area. DEP received revised Task 2 submittal on 7/16/98; technical review is complel meeting scheduled with Deputy Commissioner to discuss service area. DEP issued comments Task 2 report on 8/13/98; awaiting final Task 2 report. DEP conducted site visits of 2 possibl WWTP sites on 10/26/98. DEP approved the wastewater design flow of 238,000 gpd and completed subsurface soil investigations during the week of 11/30/98. DEP received the Tasi report on 12/28/98; evaluations continue on the 2 possible WWTP sites. Subsurface Dischai remains an option for this community. Task 3 review comments were issued 1/26/99. A meeting with the Engineer was completed at the Windham Town Hall 2/10/99. The Task 3 Report was approved 2/22/99. The Town is considering fixed media bio-towers, rotating biological contractors and Activated Sludge Extended Aeration biological treatment. Subsurl Discharge was determined not feasible 6/6/99. DEP issued correspondence allowing the Engineer to focus Task 4 study on rotating biological contractors on 5/11/99. Draft Task 4 w received 9/3/99. Task 4 review comments issued 11/19/99. Some outstanding issues are; missing basis for unit operation and unit process sizing, incomplete Process Flow Diagram, identify and select the solids disposal options, identify operation and maintenance requiremer Frog House, Thompson House and Ski Windham have not decided to hook up. Task 4 states; costs to re-engineer the NIP for Windham will be paid for by the Regulatory Upgrade Prograr (RUP) (this office disagrees), Infiltration and Inflow was not considered in the design of the plant capacity. Task 4 was approved 2/2/00. DEP received the DEIS on 4/27/00. DEIS Revi( comments issued 5/24/00. Facility Plan received 5/24/00. Facility Plan Review Comments drafted 6/23/00. Engineer submitted their response to review comments. DEP’s remaining outstanding relate to the O&M agreement and surround payment for tertiary sand filtration an

23

NYC-WTC_000291049

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291049Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Permit application, Education Dept. · page 88

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.930 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →