NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 54 pages

DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(SEQRA) process has not been submitted. Waiting for Applicant’s consultant to schedule soil testing for the SSTS. A NOCA was sent on 5/15/00 for the SPPP. A letter was sent by DEP on 6/23/00 citing deficiencies in the SPPP that must be addressed before the plan can be approved. An extension letter was sent on 6/30/00 that will extend the review period for the SPPP until issues in the previous letter are resolved. DEP received correspondence from the applicant’s attorney, regarding SSTS application on 7/11/00. DEP issued response on 7/20/00 to SSTS letter. Additional Soils Testing Completed 10/31/00. Memo correspondence was received from the Design Engineer on 11/6/00. DEP issued a review letter on 12/7/00. Correspondence was receive from the applicants consultant on 12/14/00. DEP reviewed correspondence and is completing the review letter. NOCA for the SSTS was issued on 1/25/01. The review process is ongoing since January 2000. On 3/16/01 DEP sent a letter of review comments and an extension letter. The engineer responded on 3/22/01. DEP met with the Engineer on 3/28/01 to discuss the items in DEP comments. The next day the Engineer followed up the discussions of the meeting. Extension of Review and Approval Time was agreed to by the applicant for another 45 days. The review process is ongoing since January 2000. On 4/23/01, DEP sent a letter of review comments and the letter of Extension of Review and Approval Time. A memo was received on 4/27/01 from the engineer requesting a meeting before revising the plans. The engineer informed DEP that the revision of the drawing is on going. On 9/20/01 DEP met with the design Engineer regarding a few issues related with Noncomplying Regulated Activity and Phase I SSTS (the existing) upgrading.

Town: Windham Drainage Basin: Schoharie Reservoir Project Name: Bove, Nick, (Log #8832) Project Description: Proposal to construct SSTS for New Retail Store Status: DEP received 7 sets of Plans with SSTS Application. On 9/8/99, DEP issued NOCA. DEP received SEQRA determination form the Lead Agency, Town of Windham on 9/27/99. DEP issued Design Approval on 10/7/99. DEP received a telephone call 11/19/99 that constructior is scheduled to begin on 11/22/99. Construction inspection on 12/2/99, construction in progres However, encountered a spring service from a Historical building which required a new ditch 1 route the surface drainage away form the SSTS. 2/29/00 status: Waiting for record drawings. Contacted engineer on 4/29/00 regarding the necessity to complete record drawings. Complai: received that construction was not in compliance with the regulations. Site Visit is scheduled 1 11/22/00. Site visit revealed that changes were made during construction that are not in violation of the Regulations. As-Builts are required to document the changes made during construction. DEP met with the owner on 6/7/01 to discuss the proposed expansion to his business. The site was reviewed for Stormwater plan requirements in addition to submission < an SSTS application. Based upon the verbal proposal it was determined that the project does require submittal of an SPPP, or an SSTS application. However, DEP has requested a copy o the proposal to be prepared and submitted so DEP may respond in writing to the proposal. D) was issued a proposal in writing, as requested, and submitted a letter to the owner on 7/18/01 stating that the septic system is adequate for the planned business expansion, based on the blu prints. There is no further approval required by DEP. SEQRA - Type II non-residential structure less than 4,000 sq ft.

Town: Windham Drainage Basin: Schoharie Reservoir Project Name: Windham Transfer Station, (Log #8270) Project Description: Proposed holding tank to replace an existing incineration toilet

22

NYC-WTC_000291048

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291048Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →