The monitor shall also be licensed by the NYSDOL as an air sampling technician. The
Service provider shall maintain a daily log, written legibly in black permanent ink, which
contains the following:
Name of the air sampling company and its asbestos handling license number;
Name of the monitor and NYSDOL project monitor/air sampling technician license
number;
Asbestos abatement contractor name and NYSDOL asbestos handling license
number;
The name, social security number, license number (NYSDOL and NYCDEP), and
expiration date of the Contractor’s asbestos/abatement supervisor and asbestos
handlers;
The time the asbestos abatement Contractor’s personnel arrive on site and the time
asbestos abatement work is started. The monitor shall also record the time the
asbestos abatement Contractor ceases work and its personnel exit the site;
The monitor shall record the asbestos abatement Contractor’s activities throughout
the period of work, recording the activities in the log book every one-half (Y?) hour,
when the Contractor changes work locations, or there is an unusual occurrence.
B. Throughout the course of the work, the monitor shall record a brief description of
the work being performed including the start and finish time for meal breaks. Other
breaks shall be recorded. All visitors to the site, including regulatory personnel, shall
be identified in the monitor’s log book. Also included shall be time of arrival,
organization, nature of the visit and time of departure of all visitors. If regulatory
personnel issue any violations, a description of the violation(s) shall be recorded by
the monitor including a description of the incident.
C. The monitor shall ensure that the asbestos abatement Contractor is in compliance
with all regulations and the asbestos abatement specifications and drawings. The
monitor shall inform the asbestos abatement Contractor of any deviation from the
regulations or specifications and order the asbestos abatement Contractor to take
corrective action.
If the asbestos abatement Contractor does not comply with the monitor’s directive(s), the
monitor shall issue the asbestos abatement Contractor a stop work order. The project
monitor shall record the incident in the log book detailing the nature of the deviation, the
time and the name ofthe asbestos abatement Contractor’s representative who was directed
to correct the deviation.
Environmental Monmitoring Services (S136/350)
PIN#82702RR00067 10-25-01 2
NYC-WTC_000290321