D. The monitor shall collect air samples for asbestos abatement projects based on the
requirements set forth by the applicable asbestos rules and regulations (Chapter 1 of
Title 15 NYRR or New York State Industrial Code Rule 56). The NYCDOS shall
direct the Service provider as to the type of air sample analysis to be performed
(PCM or TEM).
E. The monitor shall not leave the site during the course of the work unless another
proj ect monitor is available to take his/her place. The monitor shall take meal breaks
when the asbestos abatement Contractor’s personnel take their meal break.
F. The Service provider shall perform air monitoring services at facilities designated by
the NYCDOS even if no abatement activity is in progress at the site. When such
background air monitoring and other data gathering services are required, the
NYCDOS will issue site specific information to the Contractor including the number
of samples to be collected and the locations the samples are to be collected.
G. Final reports shall be submitted to the Department within five (5) working days after
the completion of the project.
These service requests will be considered work orders, within the definition set forth elsewhere in
these specifications. Air monitoring may be performed evenings and weekends. All air samples are
to be collected by a licensed project monitor/air sampling technician. Payment will be made on the
basis of the number of hours of monitoring services provided and the number of test samples
analyzed, on the basis of the unit prices bid. If there are no unit prices applicable, payment will be
based upon the actual and reasonable costs from the $25,000 allowance established under this
contract.
Sub Task A.2 - Asbestos Surveys
The Service provider may be required to perform asbestos surveys at various NYCDOS facilities
throughout the five boroughs of New York City. Furthermore, upon completion of the(se)
survey(s), the Service provider may be required to assist the Department in taking appropriate
remedial action. In such an event, the work order will be amended to include asbestos abatement
design services. The asbestos survey and design services will comply with the following
requirements;
A. The Service provider shall utilize sample collecting methods and equipment which
are appropriate to the form and consistency of the materials to be sampled. Methods
and equipment shall also be consistent with NYCDOS requirements and any
applicable approved sampling protocols by the United States Environmental
Protection Agency (AHERA), the National Institute for Occupational Safety and
Health (NIOSH), or other “Best Available Technology” (BAT) methods.
B. Where either pipe or spray-on insulation is layered, the integrity of layers, where they
appear, must be maintained. If the layers are sufficiently thick, samples must be
taken from each separate layer and placed in appropriately identified containers.
Environmental Monmitoring Services (S136/350)
PIN # 82702RR(X)067 10-25-01 3