ASBESTOS PROJECT MONITOR AND AIR SAMPLING CONTRACT
A. Introduction
All work performed under this contract must be in compliance with all applicable, relevant, and appropriate regulations and Scope of Work, including but not limited to those of the United States Environmental Protection Agency (USEPA), the United States Department of Labor, Occupational Safety and Health Administration (USOSHA), the New York State Department of Labor (NYSDOL), the New York State Department of Health Environnien.al Laboratory Approval Program (ELAP) and the New York City Department of Environmental Protection (NYCDEP). This project shall involve coordinating and monitoring the clean up of debris and air sampling from building apartments in the vicinity of the World Trade Center explosion site.
B. Qualifications
Project Monitors The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at le;ist 20 asbestos abatement projects. Project Monitor must have performed final c:learance inspections on at least 50 asbestos abatement projects.
Technicians Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air sampling for at least 6 months.
Proof of qualifications must be presented upon rec uest.
Equipment Sampling equipment must be in sufficient quantity to provide the amount and type of samples required for this project. At a minimum the following equipment are required: air-sampling pumps with flow rate capacities of 2 to 10 liters per minute, tripods, rotometers, sample cassettes with mixed cellulose ester filters having pore size: of 0.45um(TEM).
C. Specifications
Clean up activities shall be scheduled for 20 to 30 units per day. Air sampling shall also be provided at 10 to 20 units where clean up activities are not scheduled. Sufficient personnel shall he available for project monitoring and! sampling.
The Project Monitor shall direct and coordinate all services and report all findings to USEPA. The scope of this project will be its follows:
1. The Project Monitors shall be responsible for receiving information from the EPA Hotline, scheduling cleaning-up activities and air sampling with the tenants/owners, asbestos abatement contractors and air monitoring technicians to the various apartments.
I 7 CITY_21MC100_011961688
NYC-WTC_000408623
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000362919
Qualifications and monitoring requirements for asbestos air sampling.
5 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408464
COC outlines qualifications for asbestos monitors and third-party oversight.
6 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000233762
Contract outlining requirements for asbestos project monitoring and air sampling at the World Trade Center site.
6 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434333
Contract document establishing compliance requirements and qualifications for monitors conducting debris cleanup and air sampling near the World Trade Center site.
6 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000234300
Contract document outlining requirements for project monitors and air sampling technicians for the WTC debris cleanup and air monitoring.
6 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000234342
Contract excerpt outlining compliance requirements and qualifications for monitors and technicians involved in WTC debris cleanup.
6 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455863
Contract requirements and qualifications for asbestos monitoring and air sampling personnel.
6 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000234543
Contract document establishing compliance requirements and qualifications for monitors conducting debris cleanup and air sampling near the World Trade Center site.
6 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362539
Scope of work for asbestos abatement monitoring and sampling at 114 Liberty Street, Manhattan.
4 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429313
Scope of Work for 114 Liberty Street asbestos monitoring and sampling.
4 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000151286
Contract outline defining compliance requirements and personnel qualifications for monitoring debris cleanup and air sampling near the World Trade Center.
6 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140337
Details project scope for scheduling, coordinating, and monitoring dust and debris cleanup with air sampling from apartments affected by World Trade Center collapse.
6 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000147982
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362919
Qualifications and monitoring requirements for asbestos air sampling.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140603
Contract establishing requirements for third-party asbestos monitoring and air sampling in residential buildings.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408464
COC outlines qualifications for asbestos monitors and third-party oversight.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000233762
Contract outlining requirements for asbestos project monitoring and air sampling at the World Trade Center site.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000234342
Contract excerpt outlining compliance requirements and qualifications for monitors and technicians involved in WTC debris cleanup.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000362919
Qualifications and monitoring requirements for asbestos air sampling.
Similar indexed content
NYC-WTC_000408464
COC outlines qualifications for asbestos monitors and third-party oversight.
Similar indexed content
NYC-WTC_000151286
Contract outline defining compliance requirements and personnel qualifications for monitoring debris cleanup and air sampling near the World Trade Center.
Similar indexed content
NYC-WTC_000233762
Contract outlining requirements for asbestos project monitoring and air sampling at the World Trade Center site.
Similar indexed content
NYC-WTC_000434333
Contract document establishing compliance requirements and qualifications for monitors conducting debris cleanup and air sampling near the World Trade Center site.
Similar indexed content