Asbestos monitoring contract, co custody notes

Machine-extracted title · confidence 32%

Contract monitor requirements and qualifications for asbestos projects.

NYC-WTC_000408623–000408624
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ASBESTOS PROJECT MONITOR AND AIR SAMPLING CONTRACT

A. Introduction

All work performed under this contract must be in compliance with all applicable, relevant, and appropriate regulations and Scope of Work, including but not limited to those of the United States Environmental Protection Agency (USEPA), the United States Department of Labor, Occupational Safety and Health Administration (USOSHA), the New York State Department of Labor (NYSDOL), the New York State Department of Health Environnien.al Laboratory Approval Program (ELAP) and the New York City Department of Environmental Protection (NYCDEP). This project shall involve coordinating and monitoring the clean up of debris and air sampling from building apartments in the vicinity of the World Trade Center explosion site.

B. Qualifications

Project Monitors The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at le;ist 20 asbestos abatement projects. Project Monitor must have performed final c:learance inspections on at least 50 asbestos abatement projects.

Technicians Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air sampling for at least 6 months.

Proof of qualifications must be presented upon rec uest.

Equipment Sampling equipment must be in sufficient quantity to provide the amount and type of samples required for this project. At a minimum the following equipment are required: air-sampling pumps with flow rate capacities of 2 to 10 liters per minute, tripods, rotometers, sample cassettes with mixed cellulose ester filters having pore size: of 0.45um(TEM).

C. Specifications

Clean up activities shall be scheduled for 20 to 30 units per day. Air sampling shall also be provided at 10 to 20 units where clean up activities are not scheduled. Sufficient personnel shall he available for project monitoring and! sampling.

The Project Monitor shall direct and coordinate all services and report all findings to USEPA. The scope of this project will be its follows:

1. The Project Monitors shall be responsible for receiving information from the EPA Hotline, scheduling cleaning-up activities and air sampling with the tenants/owners, asbestos abatement contractors and air monitoring technicians to the various apartments.

I 7 CITY_21MC100_011961688

NYC-WTC_000408623

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000408623Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →