ASBESTOS PROJECT MONITOR chain of custody

Machine-extracted title · confidence 42%

Contract monitor requirements and qualifications for asbestos project oversight.

NYC-WTC_000362912–000362915
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ASBESTOS PROJECT MONITOR AND AIR SAMPLING CONTRACT

A. Introduction

All work performed under this contract must be in compliance with all applicable, relevant, and appropriate regulations and Scope of Work, including but not limited to those of the United States Environmental Protection Agency (USEPA), the United States Department of Labor, Occupational Safety and Health Administration (OSHA), the New York State Department of Labor (NYSDOL), the New York State Department of Health Environmental Laboratory Approval Program (ELAP) and the New York City Department of Environmental Protection (NYCDEP). This project shall involve coordinating and monitoring the clean up of debris and air sampling from building apartments in the vicinity of the World Trade Center explosion site.

B. Qualifications

The Third Party Air Monitor and Air Sampling Firm shall be independent of the asbestos abatement contractor. The firm shall have extensive experience in the performance of comparable work at large asbestos projects in the City of New York. The firm’s violation history shall be a significant factor in meeting the qualification requirements.

Project Monitors The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 50 asbestos abatement projects.

Technicians Air monitoring Icchnicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air sampling for at least 6 months.

Proof of qualifications must be presented upon request.

Equipment Sampling equipment must be in sufficient quantity to provide the amount and type of samples required for this project without delay of project completion time. At a minimum the following equipment are required: air-sampling pumps vdth flow rate capacities of 2 to 10 liters per minute, tripods, rotometers, sample cassettes with mixed cellulose ester filters having pore size of 0.45pm(TEM).

C. Specifications

Clean up activities shall be scheduled for 20 to 30 units per day. Air sampling shall also be provided at 10 to 20 units where clean up activities are not scheduled. Sufficient personnel and equipmentshall be available for project monitoring and sampling.

CITY_21MC100_002847553

NYC-WTC_000362912

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000362912Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →