NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 4 pages

Asbestos cleanup summary, WFC North Tower, 2002

Machine-extracted title · confidence 28%

Summary of cleanup procedures and air sampling for WFC North Tower, Jan 2002.

NYC-WTC_000282797–000282800
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

JAN-28-2002 22:21 MERRILL LYNCH 212 236 2301 P.05/06

was re-cleaned until all sample results were below these limits. Isolation barriers were removed only after passing this post sampling criteria.

Westside cleanup and other areas containing dust (1) 1“ cleaning - all surfaces were HEPA vacuumed and wet wiped by asbestos certified handlers and supervisors. (2) All areas were inspected by GPS personnel and re-cleaned as necessary. (3) Asbestos air sample collection and analysis a. PCM, Phase Contrast Microscopy and TEM, (Transmission Electron Microscopy) samples were collected by GPS, a Licensed asbestos consulting firm. b. All post samples were required to be below 0.01 f/cc (PCM) and less than 70 Structures/mml for (TEM). If one sample was at or above these limits then the area was re-cicaned until all sample results were below these limits.

Phase IJ Final Cleanup Procedure Overview - After the procedures listed below were completed the floor may be reoccupied with no restrictions. A final, detailed fine cleaning was performed by certified asbestos workers under the direction of a specialized disaster recovery firm. The space walls, floors, furniture and personal items were fined cleaned to remove residual dust. All rugs are shampooed to remove contaminates. Asbestos Final-clearance air sample collection and analysis (1) Asbestos air sample collection and analysis a. PCM, Phase Contrast Microscopy and TEM, Transmission Electron Microscopy samples were collected by GPS, a Licensed asbestos consulting firm. b. All post samples were required to be below 0.01 f/cc (PCM) and less than 70 Structuies/mm2 for (TEM). If one sample was at or above these limits then the area was re-cleaned until all sample results were below these limits. (2) Asbestos wipe sampling was collected from surfaces in representative locations and analyzed for the presence or absence of asbestos using tlie TEM qualitative analytical technique. To be acceptable all results were required to be reported as absent or negative for asbestos present.

Phast III Procedure Overview - The ventilation ductwork was inspected by a trained HVAC specialist. Areas determined to be contaminated were cleaned by a certified duct cleaning finn. All fresh air and compartmental filters were replaced. Both the upper and lower fresh air fans were turned on after Alter replacement, cleaning and inspections were complete. As a measure to ensure a safe environment for all occupants, GPS conducted asbestos air sampling for each floor for a 24-48 hour period.

Prepared by GPS Enviroamental Consultants. Inc Pg 3 of 4

C ITY_D E P_WO R B Y_C ANN ATA_S U B P_000004947

NYC-WTC_000282799

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000282799Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →