JAN-28-2002 22:21 MERRILL LYNCH 212 236 2301 P.05/06
was re-cleaned until all sample results were below these limits.
Isolation barriers were removed only after passing this post sampling
criteria.
Westside cleanup and other areas containing dust
(1) 1“ cleaning - all surfaces were HEPA vacuumed and wet wiped by
asbestos certified handlers and supervisors.
(2) All areas were inspected by GPS personnel and re-cleaned as necessary.
(3) Asbestos air sample collection and analysis
a. PCM, Phase Contrast Microscopy and TEM, (Transmission Electron
Microscopy) samples were collected by GPS, a Licensed asbestos
consulting firm.
b. All post samples were required to be below 0.01 f/cc (PCM) and less
than 70 Structures/mml for (TEM). If one sample was at or above
these limits then the area was re-cicaned until all sample results were
below these limits.
Phase IJ Final Cleanup Procedure Overview - After the procedures listed below were
completed the floor may be reoccupied with no restrictions.
A final, detailed fine cleaning was performed by certified asbestos workers under the direction of
a specialized disaster recovery firm. The space walls, floors, furniture and personal items were
fined cleaned to remove residual dust. All rugs are shampooed to remove contaminates.
Asbestos Final-clearance air sample collection and analysis
(1) Asbestos air sample collection and analysis
a. PCM, Phase Contrast Microscopy and TEM, Transmission Electron
Microscopy samples were collected by GPS, a Licensed asbestos
consulting firm.
b. All post samples were required to be below 0.01 f/cc (PCM) and less
than 70 Structuies/mm2 for (TEM). If one sample was at or above
these limits then the area was re-cleaned until all sample results were
below these limits.
(2) Asbestos wipe sampling was collected from surfaces in representative
locations and analyzed for the presence or absence of asbestos using tlie
TEM qualitative analytical technique. To be acceptable all results were
required to be reported as absent or negative for asbestos present.
Phast III Procedure Overview - The ventilation ductwork was inspected by a trained HVAC
specialist. Areas determined to be contaminated were cleaned by a certified duct cleaning finn.
All fresh air and compartmental filters were replaced. Both the upper and lower fresh air fans
were turned on after Alter replacement, cleaning and inspections were complete. As a measure to
ensure a safe environment for all occupants, GPS conducted asbestos air sampling for each floor
for a 24-48 hour period.
Prepared by GPS Enviroamental Consultants. Inc Pg 3 of 4