JRN-2S-2002 22:21 MERRILL LYNCH 212 236 2301 P.04/06
The east side of the facility, where windows were broken and gross material entered was
separated from the rest of the floor by polyethylene isolation barriers. Negative air machine were
installed to assist in controlling fiber release from the east side. Cleanup work on both the cast
and west side of the facility was performed by a licensed Asbestos Abatement Contractor
utilizing certified asbestos handlers and supervisors. CPS Environmental, a licensed Asbestos
Air Monitoring firm, performed asbestos air sampling. Sampling was performed during each
phase of the cleanup operation and at the conclusion of each phase posi/final asbestos air
sampling was performed.
Phase / Cleanup Procedure Overview
This was the initial cleanup phase of the project. After the procedures listed below were
completed the floor was cleared for occupancy without the use of respiratory protection and other
personal protective equipment. Access was limited at this time to essential personnel. Personnel
required to complete assessments. Personal items and equipment not disposed of on the eastsidc
was not to be disturbed, handled or removed from the facility until a detailed fine cleaning of
theses items could be performed, since these items may have been contaminated with asbestos
containing material. Personal items, files, etc., located on the west side also suspected of
containing dust contaminated with asbestos fibers were scheduled to be fine cleaned as described
in tlie Phase II cleanup procedure overview discussed below.
Eastside cleanup and other heavily impacted areas containing gross debris contaminated
with ACM, (asbestos containing materials)
(1) A modified containment was setup to isolate gross debris containing areas.
(2) Negative air machines were installed within the containment to help
control fiber release,
(3) Remote decontamination units were erected and used by asbestos
abatement personnel.
(4) 1” cleaning - Gross debris was doubled bagged and disposal of as asbestos
waste.
(5) 2"*^ cleaning - the exterior surfaces of all items were HEPA vacuumed and
wet wiped.
(6) All Fabric materials and ceilings were removed and disposed of.
(7) Personal items were cleaned of gross material and boxed until a decision
was made as to disposal or cleaning.
(8) Equipment was considered contaminated and disposed of or wrapped in
poly until direction was given.
(9) Prior to Post/flnal asbestos air sampling all areas were visually inspected
by GPS personnel and re-cleaned was performed as required.
(10) Asbestos air sample collection and analysis
a. PCM, Phase Contrast Microscopy and TEM, (Transmission Electron
Microscopy) samples were collected by GPS, a Licensed asbestos
consulting firm.
b. In accordance with Federal, State and Local asbestos regulations re
occupancy criteria, all post samples were required to be below 0.01
f/cc for PCM analysis and less than 70 Structurcs/mm2 for TEM
J analysis. If any sample result was al or above these limits then the area
Prepared by GP$ Environmental Consultants, Inc Pg 2 of 4
CITY_DEP_WORBY_CANNATA_SUBP_000004946
NYC-WTC_000282798