DEF Form 409N Revised 12/19/02 CITY OF NEW YORK DEPARTMENT OF ENVIRONMENTAL PROTECTION CONTRACT CHANGE
CONTRACT ID AND CONTRACT CHANGE NUMBER WTC Unoccupied Building Monitoring Program C.0.1
COMPTROLLER’S REGISTRATION NUMBER CT 826 20030011068 BUDGET LINE CONTRACT DESCRIPTION B.C. W005/OBJ 400 WTC-UNA Monitorinq of Apts in Vicinity of WTC CONTRACTOR’S NAME AND ADDRESS PIN FMS PROJECT ID ATC Associates, 104 East 25”’ Street, New York, NY 10010 32603WTCUCAM 826
CONTRACT AWARD AMOUNT DESIGN FIRM (If applicable)
$190,493.00
ITEM DESCRIPTION OF WORK CONTRACTOR’S AUTHORIZED NO. ATTACH ADDITIONAL SHEETS IF NECESSARY PROPOSAL COST
This change order is being advanced pursuant to the Declaration of Emergency signed by Commissioner Christopher O. Ward on May 7, 2002. On May 13, 2002, written approval was provided by the Corporation Counsel, and on May 28, 2002 written approval was provided by the Comptroller. This Change Order shall provide an increase in the required quantity of Project Monitor time, Air Monitoring Technician time, PCME-PCM-TEM sample analysis, and TEM analysis at the same terms and conditions of the contract.
1 Project Monitor -17 hours @$24.75 each $ 420.75 $ 420.75 2 Air Monitoring Technician -147.5 hours @ $22.50 each $ 3,318.75 $3,318.75 3 PCMe, PCM, TEM Analysis - 69 samples @ $5.00 each $ 345.00 $ 345.00 4 TEM Analysis - 692 Samples @ $55.00 each $38,060.00 $38,060.00 TOTAL (Interim (if any) or Forced (if any) PLUS Final (if any) or $42,144.50 . $42,144.50 Revised) (if any) otherwise TOTAL = This Change Order
PREVIOUS AMOUNT REGISTERED (if any) ___________ AMOUNT REQUIRED FOR REGISTRATION OF THIS CHANGE $42,144.50
1. The Contractor shall sign 4 copies of this form, and together with 4 copies of the Contractor's detailed cost proposal, send it to the Agency Contact for this Contract within seven calendar days of receipt of this proposed contract change.
2. If the total amount of the extra work (excluding credit change orders) issued for the contract exceeds 10% of the contract amount or $.50,000, whichever is greater, or exceeds previous BOE/ODC/MOC Approvals, the Agency must obtain approval from the Mayor’s Office of Construction or the Mayor's Office of Contracts (as applicable) in order to award extra work.
3. When a price is agreed to between the Commissioner’s authorized representative and the Contractor, and all required approvals have been obtained, the Contractor shall be issued a contract change to proceed with the work. Contractor shall not proceed with this work until issued a contract change or otherwise directed bv the Commissioner.
4. Any payments for extra work must be requisitioned separately from payment for work required under the original contract.
5. All work is subject to post-audit by the Department’s Engineering Audit Officer and the Comptroller's Chief Engineer.
1) CONTRACTOR'S APPROVAL 3) DEPARTMENT’S APPROVAL
Submitted above Is my Cost Proposal for the This Change Is approved and the contractor/consultant is directed to Contract Change. Contractor hereby certifies that proceed. Payment will be made as provided herein. the cost and pricing data submitted are accurate. complete and current. [ ] On a Time and Material Basis Not-to-Exceed the Authorized Cost
Contractor’s Signature^ [ ] On a Unit Price Basis Not-to-Exceed the Authorized Cost
Title 3 Date: [ ] At the Authorized Cost
2) CONTRACTOR AGREES WITH “AUTHORIZED COST” ( } Cost Plus Fixed Fee Not-to-Exceed the Authorized Cost Authorized Signature rO. ----- -------------- Contractor’s Signature Date: <1*1^ Tide ---- Date: Title
CITY_2IMCl0 0_0 015 9 2 5 S S NYC-WTC_000279061
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000279060
DEP contract change document for monitoring apartments near the WTC area, ATC Associates listed.
3 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135164
DEP contract change form for the monitoring of apartments in the vicinity of the World Trade Center site dated 2003.
1 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163514
Internal DEP communication transmitting contract change orders for rooftop work requiring contractor signatures.
1 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164020
Correspondence submitting draft contract modifications for exterior cleaning and air monitoring work.
1 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135336
Letter from Asbestos Removal Corp. to DEP Director advising against construction paper installation during carpet removal at 310 Greenwich Street.
3 shared non-person entities · similarity 0.913
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163040
Draft change order for WTC cleaning contracts establishing unit prices for HVAC cleaning without increasing contract NTE price.
1 shared non-person entities · 1 shared topics · similarity 0.910
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168193
Fax cover sheet from Milo Kleinberg Design Associates dated July 17, 1997, listing TAA application forms and riders.
Similar document embedding; no shared entity or topic indexed. · similarity 0.893
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153563
Document page from DEP Box 26 regarding World Trade Center Air Quadrant D with illegible text content.
1 shared non-person entities · similarity 0.889
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168166
Fax cover sheet from Milo Kleinberg Design Associates dated July 17, 1997, regarding WTC/PA TAA application forms.
Similar document embedding; no shared entity or topic indexed. · similarity 0.889
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290924
Change form for environmental consulting services under DDC project; project/contract details.
1 shared topics · similarity 0.883
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154143
Contract document between the City of New York DEP and a contractor for supply and services at World Trade Center residential sites.
1 shared non-person entities · 1 shared topics · similarity 0.882
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000097100
Invitation to bid on environmental sampling and asbestos air monitoring services for the interior of 125 Cedar Street.
1 shared non-person entities · similarity 0.878
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000135975
Document containing illegible text or corrupted data within the Department of Environmental Protection's Athena D Terms records.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135336
Letter from Asbestos Removal Corp. to DEP Director advising against construction paper installation during carpet removal at 310 Greenwich Street.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163514
Internal DEP communication transmitting contract change orders for rooftop work requiring contractor signatures.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135164
DEP contract change form for the monitoring of apartments in the vicinity of the World Trade Center site dated 2003.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000133965
Correspondence or record related to asbestos removal activities at the World Trade Center site.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163514
Internal DEP communication transmitting contract change orders for rooftop work requiring contractor signatures.
Similarity score 0.981 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
DEP contract change document for monitoring apartments near the WTC area, ATC Associates listed.
Similar indexed content
DEP contract change form for the monitoring of apartments in the vicinity of the World Trade Center site dated 2003.
Similar indexed content
NYC-WTC_000163514
Internal DEP communication transmitting contract change orders for rooftop work requiring contractor signatures.
Similar indexed content
NYC-WTC_000164020
Correspondence submitting draft contract modifications for exterior cleaning and air monitoring work.