NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Contract change form for environmental consulting, DDC

Machine-extracted title · confidence 43%

Change form for environmental consulting services under DDC project; project/contract details.

NYC-WTC_000290924
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document CITY OF NEW YORK DEPARTMENT OF DESIGN AND CONSTRUCTION CONTRACT CHANGE FORM (Note; For CM Build/CM Design Build contracts, use DDC’s CM Build/CM Design Build Contract Change Form) PART A: DIVISION: [ ] STRUCTURES (S) [X ] TECHNICAL SUPPORT (T) [] INFRASTRUCTURE (I) CAPIS I P. PW 335EPS7 | CONTRACT REG. NO. 20010021981 I DISCOVERY NO. 1 I CHANGE ORDERNO. 1 PROJECT DESCRIPTION: Environmental Consulting Requirements Contract PROJECT BOROUGH: [ ] BX [ ] BK [ ] M 11 Q [ 1 SI (X ] MULTI [ ] OTHER: All (5) RE/SE/PM NAME (DDC EMPLOYEE): Stephanie Obloj TEL: (718) 391-1291 CONTRACTOR’S NAME, TRADE, & ADDRESS: ATC Group Services Inc. [ ] CONSTRUCTION [X ) CONSULTANT (INC. CM/REI) 104 East 25“ Street, 10“ Floor, New York, NY 10010 CONTRACTOR’S TEL; (212) 353-8280 DESIGN CONSULTANT (IF CONSTRUCTION): CLIENT AGENCY(S); DDC CONTRACTOR’S FAX: (212) 353-8306 CONTRACT AWARD AMT. REG. & PENDING CO/OR’S TO DATE: CUMUL. % OF CO/OR’S: ROUGH ESTIMATE FOR THIS C O. $ 1,000,000.00 $961,003.54 97 % $ 961,003.54 DESCRIPTION OF VVORK. IN THE SPACE BELOW AND ON ADDITIONAL PAGES, IF NECESSARY; Describe the work to be performed in this Contract Change. Describe the work shown on any drawings, plans, etc. referred to and attach one set of each.

It is anticipated that the maximum fee will be exceeded prior to the expiration of the contract period. As a result of the greater need on the part of the Agency’s involvement in providing emergency services to address hazardous materials and site safety at the World Trade Center Crisis, there has been an increase in the amount of environmental sampling and analysis and technical labor provided under this contract. We request an additional contract fee of $ 961,003.54 not to exceed an revised contract fee of $ 1, 961,003.54. The revised contract fee will ensure that an adequate level of environmental consulting services will be available to manage hazardous materials and site safety issues. DescruJtiqn Technical Labor Estimated Value Environmental sampling & analysis Estimated Value $ 4-3,575.00- ‘fo.flOO Laboratory' Equipment, Data Collectors, allowable expenses Estimated Value $ ■I27,OOO.IX>'- aao

Total Value of change order

CO CLASSIFICATION: [ ] NON-MATERIAL SCOPE CHANGE. (] FIELD CONDITION [) ADMINISTRATIVE CHANGE [] DESIGN ERROR [] DESIGN OMISSION [] COMPTROLLER’S DISPUTE DETERMINATION [X] OTHER AGENCY COMMENTS: 1. Is a Time Extension necessary? [ ] Yes [X ] No. If yes, this CCF will be used in a future TE to [ ] increase [ ] decrease time by approx. ( ) ccds. 2. Will this extra wo.';:; impact the critical path of the project? [ J Yes [X ] No 3. Will other contracts be affected? [ ] Yes [X ] No. If yes, which contracts?________________________________________________ 4. Is ODC approval required? [X ] Yes [ ] No (COTS/CBCOTU to complete following Final Package submission) 5. Is this a client agency requested change? [X ) Yes [ ] No; Is this change order a result of an Agency Head Dispute Determination? [ ] Yes [X ] No FOR REQUIREMENTS CONTRACTS ONLY: ACCO S AUTHORIZED SIGNATURE: DATE: PRINT NAME:Stephanie Obloj TEL: (718)391-1291 AUTHORIZED FOR PROCESSING* UNIT/SECTION/MANAGmC BORO: Tech. Support/Environ Health Site Safety FAX: (718)391 -1499 SIGNATURE: __ ________________________________ PART B; (TO BE COMPLETED AT NEGOTIAl'lONS)'/ f/ / /

DDC ESTIMATE: BY: IX ] RE/PM [ 1 CONS CONTRACTOR’S PROPOSAL; FINAL AIITH CO.ST NEG BY: [X ] RE/PM [ ] CONS $ 961,003.54 $ 961,003.54 $961,003.54 T & M SUBTOTAL: $ N/A NEG. LUMP SUM SUBTOTAL: $ N/A UNIT PRICE SUBTOTAL: $961,003.54 1. Contractor shall not proceed with this work until issued a Contract Change or otherwise directed by the Commissioner. All work begun before Contract Change is registered by the Comptroller’s Office is done at the Contractnr'.s own risk. 2. All work is subject to audit by the Department’s Engineering Audit Officer and to post-audit by the Comptroller’s Chief Engineer. 3. All payments for extra work must be requisitioned separately from payments for work required under the original Contract (except at Final Payments). CONTRACTOR’S APPROVAL DEPARTMENT OF DESIGN AND CONSTRUCTION APPROVAL BY SIGNING IN THE SPACE BELOW, THE CONTRACTOR: THE AMOUNT OF THIS CONTRACT CHANGE IS APPROVED. PAYMENT WILL BE MADE IN ACCORDANCE WITH THE AGREEMENT AND SHALL NOT EXCEED THE FINAL 1. CERTIFIES THAT ITS FINAL COST PROPOSAL FOR THE CONTRACT AUTHORIZED COST. PAYMENT MAY NOT BE MADE PRIOR TO REGISTRATION OF THIS CHANGE, AS SET FORTH ABOVE, IS BASED UPON COST AND PRICING CONTRACT CHANGE BY THE COMPTROLLER’S OFFICE. INFORMATION, WHICH IS ACCURATE, COMPLETE AND C URRENT AS OF THE DATE OF THE PROPOSAL SUBMISSION, AND (] ON A TIME AND MATERIAL BASIS 2. AGREES TO PERFORM THE WORK DESCRIBED IN THIS CONTRACT [ ] ON A NEGOTIATED LUMP SUM BASIS CHANGE IN ACCORDANCE WTFH-"FHK.JINAL AUTHORIZED COST [ ] ON A UNIT PRICE BASIS AND/OR THE NOT TO EXCEE^OSTJkiMlTAsriON SEWORTH 'H ABOVE. AUTHORIZED DDC SIGNATURE* CONTRACT^’S SIG1^TURE\^4 IjLa^Vl2^^ PRINT NAME:__________________________ TITLE: _ 12'0- rI ___ DATE: ------ - TITLE:________________________________ DATE;

Attachments: [ ] Change Order Justification; Part C^cquired) [ ] Change Order Estimate Summary Form: Part D(Requlrcd) [ ] Vendor’s Cost Proposal (Required)

* Authorized Signatures (DDC Employees Only)- Structures: < $50,000 = Project Manager; > $50,000 = Program Director; ifRequirements Contract: Program Unit or Triad based contract = Triad AJC, if Division-wide contract = First A/C.Infrastructure: $50,000 = Section Engineer; > $50,000 = Deputy Boro. Director; if Requirements Contract: Site Specific = Section Engineer, Non-Site Specific = AJC Program Management. Tech. Support: Section Director. green 12 09/01/98; Rev. 01/01/99; Rev. 10/15/99

CITY_21MC100_007083530

NYC-WTC_000290924

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000290924Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279060

DEP contract change document for monitoring apartments near the WTC area, ATC Associates listed.

Similar indexed content

Compare copies and versions →