atrium. The air handlers use a common air return with no makeup air being drawn from outside
the building. Access to the ductwork on the north side of the building must be through the access
grill openings, because the ceiling is enclosed in sheet rock. Access to the ductwork on the south
side is through a suspended ceiling. The ceiling tiles in the area of the ductwork and the
insulation wrapping the ductwork were removed prior to cleaning the ducts. The space from the
suspended ceiling to the upper deck, including the grid work, was vacuumed. An isolation wall
was fabricated to bar the north side from the south side.
The services of an HVAC consultant were secured to develop site specific cleaning procedures,
and to stipulate necessary controls, protective measures, and standards for the cleaning and
sampling confirmation process.
Commercial Unit Barber Shop that is situated below grade. The unit contains a ductless AC
system with a remote condenser/compressor unit. The condenser/compressor unit is located
above the entrance door that accesses Liberty Street. The air handling system and the
condenser/compressor unit was cleaned in an effort to remove accumulated residual dust and
debris so that the units could be handled for disposal by the building owner.
2.1. Cleaning of Building Exterior/Roof
Cleaning of the building exterior and the rooftop was accomplished and monitored by the
NYCDEP hired an asbestos abatement contractor to accomplish this task. Cleaning of the
building exterior was initiated at approximately the same time cleaning of the interior of the
building began. NYCDEP subcontractors were required to vacuum and wash the building
exterior twice before acceptable results were achieved.
The roof of the building has two elevations: 1) a roof at the fifth floor level, and 2) an atrium
roof at the second floor level. Four residential compressor/condenser units are situated on the
fifth floor roof. These service ductless air conditioning units in the residential apartments. Prior
to the pilot study, these units were cleaned by outside contractors. Three commercial
compressor/condenser units are situated on the atrium roof of the building. These units service
the Chiropractor's Office, the Retail Mattress Showroom and the Lemongrass Grill. These three
units were cleaned as part of the pilot study. The Food Exchange air conditioning system utilizes
a water-cooling tower located on the atrium roof that was also cleaned.
2.J. Synopsis of Cleaning Method by Building Area
The following table presents an overview of the test used to clean each area of the building as
well as a description of that area. A full description of the cleaning activities can be found in
Attachment 12, Synopsis of Cleaning Methods by Building Area.