NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 123 pages

Interim final WTC study project report

Machine-extracted title · confidence 40%

Interim final report noting organizations involved and plan for third-party review.

NYC-WTC_000363060–000363182
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

baseboard systems. In most cases, window-mounted air conditioners were in place to cool the residential units. Types of air conditioning systems present in the building are identified in Table 2.0.

Table 2. f) Air Conditioning Systems by Unit

Unit System Residential Apartments 5 A, 5C, 5D Ductless A/C unit, with remote condenser/eompressor unit Residential Apartments 2A, 2B, 3B, 3C, 3D, Window/wall mounted units 4A,4B,4C,4D Baldwin Realty Company (3 A) Ductless A/C with remote condenser/eompressor unit Chiropractor’s Office Air handling unit with remote condenser/eompressor unit (Atrium) Mattress Store Air handling unit with remote condenser/eompressor unit (Atrium) Lemongrass Grill HVAC self contained system, makeup air system with hood, 2 ductless air systems with remote compressor/condenser units (Atrium) The Food Exchange Two air handling units with remote cooling tower (Atrium) Barber Shop Ductless A/G unit with remote condenser/eompressor unit

Building Condition Both Cedar Street and Liberty Street were closed to traffic after the WTC attack. Tenants were not permitted to enter the building. EPA, other governmental officials, and the building owner had been the only individuals authorized to enter the building since September 11, 2001. Presently, the residential spaces of the building are being re-occupied. The NYC Building Department inspected the building for structural integrity prior to EPA mobilization to the site.

The building interior had been professionally cleaned by the building owner, Liberty Street Associates, LLC, shortly after the collapse of the WTC. Those cleaning activities focused on the removal of gross dust and debris. Floors, walls and ceilings were cleaned using HEPA vacuums, AFDs and wet wiping using soap and water. Personal items, such as fiirniture, clothing, electronics and kitchenware were not cleaned. The cleaning began on October 29, 2001 and was completed on November 11, 2001. The cleaning performed during this period was limited to the residential units, the common areas, the basement, the roof, and the Baldwin Realty Company 11

CITY_21MC100_011063381

NYC-WTC_000363073

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363073Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →