NYC-WTC_000291181
Transmittal letter listing agencies/consultants involved in project work.
17 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗Transmittal letter listing agencies, consultants, and contractors for DOT project phases.
NYC-WTC_000267434OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Tishman/Harris Whitehall Ferry Terminal Joint Venture Battery Maritime Building, 2"^*. Floor - Room 201 New York, NY 10004 HARRIS Tel: 212-968-9227 Fax: 212-968-1849
LETTER OF TRANSMITTAL
TO: AGENCIES A CONSULTANTS OFF,, FIELD, TO: CONTRACTORS off SFIELD N.Y.C. Economic Development Corp. Phase 0 - Butler, Inc. - Michael Butler N.Y.C.D.O.T. - Dolores Barbieri # 1 - Seasons Contracting Corp.- Rob Singley N.Y.C.D.O.T. - Ferry Operations - Earl Bairn # 2 - Pile Foundation Const. - Tony Rivara N.Y.C.D.O.T.-Al Smith_____________________ 3 - ADF Steel Corp. - Gilles Poirier Flour Daniels - FTA #3 - PCM Erectors - Bob Mahoney________ New York City Transit Authority - A. Lazo______ fr 4 - Prismatic Development - Mike Meltzer Con Edison - Bill Horvath #5A - W&W Glass Systems - Vai Noretz Schwartz Architects_________________________ #5B - Industrial Const. Services - Jae Horbacz TAMS Consultants, Inc. #5C - Donaldson Acoustics Co. - Joe Bannen Flack & Kurtz Consultants #5E - Mometal, Inc. - Ron Picard Wang Engineering Services___________________ #5F - Ken Herman, Inc. - AI Shad Robert Silman Associates #5G - Coordinated Metals - Larry Platman LJ Strandberg______________________________ if6 - Wolkow-Braker Roofing - Felix Wolko RPO_____________________________________ #7 - Arena Construction Co. - Ken Barisich Testwell Laboratories, Inc. #8 - Kone, Inc. - Al Hanzel Total Safety Consultants #9 - Fresh Meadows Mechanical -Bob Angelo Han Padron #11-Five Star Electric - Ed Stein N.Y.C. DOT - Robert Grotell #12 -WDF/Greene - Anatoly
WE ARE SENDING YOU VIA: □ MESSENGER □ OVERNIGHT/UPS - 2’^“ DAY □ FAX □ UNITED REPROGRAPHICS H BY HAND □ PICK-UP GROUND TRACK □ CONTRACT DWGS. □ SHOP DRAWINGS □ CATALOG CUTS □ SPECS. □ SAMPLES B SKETCHES(ES) □ OTHER
Instruction: 1 - Submitted for approval 5 - For coordination 2- For your information 6 - Submit your proposal for changes that impact your work 3 - For your use 7 - Please return with your approval stamp 4 - As per your request 8 - Other
ITEM DESCRIPTION______________________________________ REV. DATE ACTION 1 Full Size CSK-68 Third Floor Plan & Reflected Ceiling Plan 1/17/00 FYU
cc:A.Gale, R.Damigella
NYC-WTC_000267434
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000291181
Transmittal letter listing agencies/consultants involved in project work.
17 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000136897
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0122.
1 shared topics · similarity 0.882
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000136819
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0141.
1 shared topics · similarity 0.879
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165262
A cover sheet or index page for documents related to the repair of bridges on the New York Expressway and Dyer Avenue.
1 shared topics · similarity 0.877
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111655
Automated transmission confirmation from DEP to a contract inspector regarding WTC site activities dated November 7, 2002.
1 shared topics · similarity 0.876
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165265
Port Authority submits bridge repair drawings for West 34th through 39th Streets to DEP for review.
1 shared topics · similarity 0.875
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165853
Contract notes specifying requirements for maintaining existing connections and restoring manholes during tunnel construction.
1 shared topics · similarity 0.874
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111871
Attendance sheet from a meeting regarding World Trade Center debris cleanup operations held in September 2002.
1 shared topics · similarity 0.874
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165259
DEP letter to Port Authority requesting existing sewer information before reviewing plans for bridge rehabilitation.
1 shared topics · similarity 0.873
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111727
Automated fax transmission log confirming successful delivery of documents to DEP on October 9, 2002.
1 shared topics · similarity 0.872
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126218
Department of Environmental Protection internal menu form dated December 12, 2006, associated with the building at 20 Dey Street.
Similar document embedding; no shared entity or topic indexed. · similarity 0.872
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123764
DEP letter to Trinity Church Corp notifying of exterior surveys identifying WTC debris at 209 Broadway.
1 shared topics · similarity 0.872
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000291181
Transmittal letter listing agencies/consultants involved in project work.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095006
A representative declines participation in a DEP program for 4 South Street due to scheduled demolition and reconstruction plans.
Similarity score 0.933 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165256
Department of Environmental Protection letter dated February 9, 1982, stating no further comments are required as the Lincoln Tunnel bridge rehabilitation involves no sewer work.
Similarity score 0.931 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152662
Document listing specific street intersections for various shafts in the Lower Manhattan area.
Similarity score 0.931 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165451
Department of Transportation transmittal letter listing distribution recipients for a project involving bridge and sewer work.
Similarity score 0.929 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165259
DEP letter to Port Authority requesting existing sewer information before reviewing plans for bridge rehabilitation.
Similarity score 0.929 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000291181
Transmittal letter listing agencies/consultants involved in project work.
Similar indexed content
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0122.
Similar indexed content
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0141.
Similar indexed content
A cover sheet or index page for documents related to the repair of bridges on the New York Expressway and Dyer Avenue.
Similar indexed content
Automated transmission confirmation from DEP to a contract inspector regarding WTC site activities dated November 7, 2002.
Similar indexed content