NYC-WTC_000265792
Asbestos inspection report basis and fee information for NYC DEP.
3 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗Asbestos inspection report form with facility data, start/completion dates, and fee note.
NYC-WTC_000266187OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 55000 0 ASBESTOS INSPECTION REPORT Basis of Inspection: £4- MS LTW16TOMW03jg^ 0 o” ONLY TYPEWRITTEN APPLICATIONS WILL BE FEE EXEMPT: No NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE 1. $1,200.0 OF START OF THE WORK (ABATEMENT ACTIVITIES)
START DATE: 12/3/2003 COMPLETION DATE: 10/1/2004
I. FACILITY ADDRESS: 55 WATER STREET BORO: MANHATTAN ZIP: 10041
TYPE OFFACILITY: COMMERCIAL BLOCK: 32 LOT: 7501
II. BUILDING OWNER NAME: NEW WATER STREET CORP TEL.#: (212)747-9120 ADDRESS: 55 WATER STREET CITY: NEW YORK STATE: NY ZIP: 10041
IV. ASBESTOS ABATEMENT CONTRACTOR NAME: pal environmental safety corp TEL.#: 1718)349-0900 FEDERAL EMPLOYER IDENTIFICATION # : 11-3167874 ADDRESS: 43-09 vernon blvd CITY: lie ny STATE: ny ZIP: 11101
V. THIRD PARTY AIR MONITOR NAME: ADVANCED ENVIRONMENTAL TEL. #; ADDRESS: 375 FIFTH AVENUE CITY: NEW YORK STATE: NY ZIP; 10017 VI. laboratoryJor^ample analysis NAME: EMSL ANALYTICAL INC. OF NYC NYSELAP#: 11506 ASBESTOS WORK SCHEDULE □ DAY 0 EVENING 0 NIGHT 0 WEEKENDS 0 WEEKDAYS
INSPECTOR NAME: SaT'a SQUAD #: BADGE#: DATE OF INSPECTION: U /oS TIME OF INSPECTION: From: lO’ IS PM □ Contact at site: t g>r4 C SgC UiS i?^ am PM □ inspection disclosed that the following sections vi/ere complied with: (Check all that apply) j 1-51 - Notifications, Reports, Plan j 1-71 - Air Sampling and Monitoring ; J 1-91 - Worker Protection
1-101 - Materials and Equipment I j 1-116 - Work Place Preparation 1 1-117 - Worker Decontamination System
I223 1-113 - Waste Decontamination System 1-126 - Engineering Controls I 1-1 27 - Entry/Exit Procedures
' 1-129 - Maintenance of Barriers |J 1-138 - Encapsulation rj 1-139-Enclosure
g 1-140- Glovebag 1-141 -Tent 1-137 - ACM Disturbance, RemoveL, .Handling
!.a. 1-146 - Preliminary Clean-up
I____i Project not started I 1-147 - Final Clean-up
. Inspection
revealed all ACM to be intact. New start date:
Project ongoing, expected completion date:
I i Project completed on or about^ / . All surfaces, including abated surfaces are free of visible ACM and encapsulate
I____I Follow up necessary on
Samples taken: | No [ Yes 1 2 3
4 5 5 Photos taken; I Yes No Additional comments:
\ ■VV4L- 1 o .ax 4 n-U2.vJ-
VsSeve, VO A V-va r; ■isA.cUrC't
RESULT CODE BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND
RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPEf INITIALS
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)
CITY_DEP_WORBY_CANNATA_SUBP_000131651
NYC-WTC_000266187
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000265792
Asbestos inspection report basis and fee information for NYC DEP.
3 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000114015
Report documenting an asbestos inspection at 333 Rector Place scheduled for October 2002.
3 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100575
Report summarizing asbestos inspection findings and project dates for exterior areas at 110 Liberty Street.
3 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113540
Form documenting an asbestos inspection at the facility with a start date of October 4, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000110312
Asbestos inspection report header with totals and basis of inspection.
2 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000114924
Inspection record documenting the condition of the roof and facade at 60 Pine Street regarding asbestos presence.
3 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108285
Data collection form recording building details and inspection results regarding ACM presence at a WTC vicinity site.
3 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗3 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000114893
Report summarizing the scope and findings of an asbestos inspection conducted on the roof and facade of the building.
3 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108219
NYC DEP asbestos inspection report form for 120 Liberty/125 Cedar Streets with a start date of June 20, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100320
Report documenting an asbestos inspection at 51 Murray Street with a start date of June 21, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100831
A letter confirming final air sampling results met clearance criteria for 114 Liberty Street after roofing work.
3 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000265792
Asbestos inspection report basis and fee information for NYC DEP.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100575
Report summarizing asbestos inspection findings and project dates for exterior areas at 110 Liberty Street.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000114015
Report documenting an asbestos inspection at 333 Rector Place scheduled for October 2002.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126919
Summary of an asbestos inspection report detailing total linear feet surveyed and fee exemption status.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112182
Invoice from Asbestos Removal Corp for asphalt and gravel roof cleanup services performed at 14 Wall Street in December 2002.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100549
Invoice from Asbestos Removal Corp detailing costs for asphalt and gravel roof cleanup at 112 Liberty Street.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000265792
Asbestos inspection report basis and fee information for NYC DEP.
Similar indexed content
NYC-WTC_000114015
Report documenting an asbestos inspection at 333 Rector Place scheduled for October 2002.
Similar indexed content
NYC-WTC_000100575
Report summarizing asbestos inspection findings and project dates for exterior areas at 110 Liberty Street.
Similar indexed content
NYC-WTC_000113540
Form documenting an asbestos inspection at the facility with a start date of October 4, 2002.
Similar indexed content
NYC-WTC_000110312
Asbestos inspection report header with totals and basis of inspection.
Similar indexed content