NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premises: Inspection Date:
130 Liberty Street 11/10/08
Floor Zip Borough Block Lot Squad# Badge# AO11
Various 10006 1 54 1 1
Inspector i Building Type Basis of Inspection Photos Taken
N. Patel . IA TRU0238MN08 No
Contractor's Name Sample Number
LVI Environmental
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 (973) 772-3660
Laboratory Name Owner’s Name
TRC Environmental corp. The Lower Manhattan Development Corp.
Address City Address City
1430 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr. /TRC Environmental 5:00 pm - 5:50 pm (9"^ & 8’'^ floor) and 9:15 pm
-10:00 pm (7*^&6'^ floor).
On the 9'" floor, I enters decon area, suits up, dons respirator, enters containment and Mr. Derek Isabelle,
supervisor. There were 24 people working on the floor. They were scrapping fireproofing in the west side,
spraying amended water on the ceiling and on the debris, boxing debris, loading Gaylord boxes from the south
side by spraying water on it, preparing Gaylord boxes and in the decontamination system. Fifteen (15) Gaylord
boxes piled on the floor ready to be load out. Negative Air pressure was -0.064.1 used stair B to go to 8'*' flour.
On the 8'*' floor, I met Mr. Raymon Berard, supervisor. There were 22 people working on the floor. They were
scrapping fireproofing ceiling in the East side, spraying amended water on the ceiling and on the debris, fixing
water pumps, preparing Gaylord boxes and boxing debris from the floor. Ten (10) Gaylord boxes and poly
wrapped materials piled on the floor ready to be load out. An inspection was done on the micro trap machines
and micro trap tents - Air pumps were on. 1 used stair B to go back to 9‘*' floor, proceeded to the
decontamination system, decontaminated myself, signed the log book and exited.
On the 7''’ floor, 1 entered the containment area with PPE and met Mr. Lauro Caprio. There were 17 people
working on the floor. They were scrapping fireproofing in the West side with spraying amended water on the
ceiling and floor, boxing debris, preparing Gaylord boxes and in the decontamination system. Seven (7) Gaylord
boxes were on the floor. Negative Air pressure was -0.063. An inspection was done on the micro trap machines
and micro trap tents Air pumps were on. 1 used stair B to go to 6'*' floor.
On the 6''’ floor, 1 met Mr. Luis Moya, supervisor. There were 22 people working on the floor. They were
scrapping fireproofing in the S/W comer by amended water spraying on it, boxing debris, preparing Gaylord
boxes and cleaning floor. .ATC personnel were doing inspection on the columns and beams in the S/E corner.
Four (4) boxes were on the floor ready to be load out. I used stair B to go to 7'*’ floor, proceeded to the
decontamination system, decontaminated myself, and signed the log book and exit out.
Trow kesult
2
NOV#
■ROW SUPtKViSOR
Borough I =Manhailan 2=Bronx 3=Brooklyn 4=(3uecns 5=Richmond
Building Type A >6 stories B <6 stories C single family Dschool E hospital I- public owned
Result Code I = Violation Issued 2=Nd Violation Issued 3=No access 4=lYoject no! slarled (no NOV) 5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000131301
NYC-WTC_000266097