NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

NYC-WTC_000266065

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000266065
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 02/17/09 Floor I Zip Borough Block Lot Squad # Badge # Various | 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068l\/IN08 yes Contractor's Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:40 am to 10:00 am

I arrived at the premise at 8:40 am, proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on S'^floor. One worker was present for the decon maintenance, cleaning the shower room. I used B stairwell to proceed to the 4**' floor. 4*" Floor - 41 workers were present on the floor, cleaning the horizontal and vertical surfaces at the west side spandular beams, repairing electrical bulb cage, cleaning the poly of the electrical panel, wrapping cables, washing, sweeping and vacuuming the floor between the shafts with equipment equipped with HEPA filters, fine clearing off the floor. I observed that the tape around the door of the electrical room was detached. Supervisor was advised to direct workers, and the door was re-sealed immediately. Inspection was done on micro trap machines and tents. I used B stairs to proceed to the S'^floor. 3'^“ Floor - 33 workers were working on the floor, demolishing the sheetrock wall around the shaft area; setting up the platforms inside the shaft area, wrapping electrical cables, removing metals from the ceiling, using scissor lift, cutting metal with the tools attached to the HEPA vacuum, wrapping beams with poly. Others were loading out boxes and poly wrapped beams, picking up debris, preparing boxes. 8 sealed and sprayed Gaylord boxes were ready to be taken out. 32 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the 2'’“ floor. 2"“ Floor - 40 workers were found inside the work place, demolishing the escalator shaft, spraying with amended water around the area, picking up debris and placing into the boxes, two workers on scissor lift at the north/east side of the work area were cutting metal from the ceiling, cutting air ducts and pipes inside the mezzanine, located between 2"^ and floors; cutting pipes and metal fixtures from the ceiling at the shaft. Others cutting metal into the pieces, using power tool with HEPA vacuum attached, spraying the area with amended water, removing metal ceiling components; wrapping beams with poly, preparing boxes. 6 Gaylord boxes were on the floor sealed, sprayed and ready for load out. I observed that one light bulb protection was open, and poly around the electrical cables was tiered. Handler Supervisor was advised, who directed workers to repair the cage and re-tape the poly. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the V floor. 1’* Floor - 40 people were performing work, clearing shafts from debris, placing into the boxes and spraying with amended water; demolishing the drop ceiling to cut and remove the air duct and pipes with electrical wires. Workers cutting metal and placing into the boxes, spraying the work areas with amended water, preparing, wrapping and loading out boxes through the waste decon. A large amount of debris and poly wrapped beams exists on the floor. 5 sealed and 12 open Gaylord boxes were on the floor. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 3''Yoor After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor's Initial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code I = Violation Issued 2=1^0 Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000131227

NYC-WTC_000266065

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000266065Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →