NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection, 130 Liberty Street, Jul 2009

Machine-extracted title · confidence 44%

Asbestos inspection record for 130 Liberty Street with contractor details and photos.

NYC-WTC_000266052
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 07/22/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number 462 Getty Avenue Clifton State Zip Phone Sample Number NJ 07011 973-772-3660 Third Party Air Monitor Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 212-221-7822 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:00 pm 2:00 pm

I arrived at the premise at 1:00 pm, LVI schedule informed that activities include: exterior fagade removal, i setting up scaffolding for fagade work, prep & remove North exterior column tents on 3'''' and 2'"' floors; abate columns at West Atrium/Vestibule on 2"'floor; break down work area on V floor; demo ducts and conduits, scrape fireproofing, box out debris in basement. I used west side scaffolding ladder to proceed to the 2"'“ floor, entered the decon, suit up, don respirator and entered the work area.

2”“ Floor - Three handlers inside the tent were breaking down the bricks around the left side column at the west Atrium vestibule, spraying the area with amended water. At the other side of the column 3 workers were cleaning and washing the scaffold, poly and the floor. 12 sealed Gaylord boxes were on the floor ready for load out. After decontamination procedure I suit up, don respirator and using stairs to proceed to the 3"* floor North exterior column tents work area.

3'“ Floor - No activities or personnel observed inside tents at the north/west side area, the shift was cancelled due to DOB stop work after a concrete slab fell from the scaffold tent until the bottom of the second tent on the first floor ceiling level is repaired. Workers were observed at the east side outside scaffolds wearing suits, gloves and masks, cutting and removing the aluminum column covers. Area was sealed with caution tape, 8 Gaylord boxes were on the floor ready to be taken down. I used west side scaffolding ladders, returned to the ground floor and proceeded to the west side V floor decon to gain the access to the basement A. Three workers were present for the decon maintenance, cleaning the clean room and organizing shower room. Negative air pressure on the floor was -0.036.

Basement - 35 Asbestos Handlers were present inside the work area. Workers inside electrical room #2 were demolishing the machinery, cutting metal from the ceiling, breaking the part of the cinder wall to open the column. At the pump room workers were scraping fireproofing, spraying the area with amended water, picking up debris from the floor; plasticizing the floor with poly at the former electrical room #2, scraping fireproofing and washing the ceiling. Other workers were placing debris into the boxes; preparing and loading out sprayed boxes through the waste decon, replacing filters of the micro traps. 40 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents. After following the decontamination procedure I exited the work area. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code I = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000131001

NYC-WTC_000266052

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000266052Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →