Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 03/12/09
Floor Zip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor's Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr, Proj. MgrZTRC Environmental 10:45 pm to 11:40 pm
I arrived at the premise at 10:45 pm. LVI schedule informed that activities include:
clear floor, cut ducts, demo walls, ceilings on floor.
I proceeded to the decon, signed the log book, don the appropriate level of personal
protective equipment to enter the regulated area on Vfloor Three workers were present
for the decon maintenance, cleaning the shower chambers and organizing the clean room.
Manometer reading of the negative air pressure was -0.045.
V* Floor - 58 workers were present inside the work area. Workers were clearing the
shafts from debris, spraying with amended water, placing debris into the boxes.
Three workers were observed in scissor lifts removing insulation, then cutting the air duct,
using power tools, attached to the HEPA vacuum. The area has been sprayed with
amended water.
Workers on mezzanine inside the engine room were cutting and removing conduit.
Two workers in scissor lift were demolishing the plaster ceiling at the east side
hallway - former Cedar Way area, using hammer and electrical power tool,
attached to the HEPA vacuum.
Four workers harnessed in two scissor.lifts were breaking plaster ceiling into the
pieces on the west side hallway, one worker was spraying area with amended water.
Other workers were: cutting metal fixtures from the ceiling; cutting metal into small pieces
at the various locations, placing into the boxes and spraying with amended water;
preparing boxes, wrapping beams with poly, loading out sealed and sprayed boxes
through the north side wastes decon.
A large amount of debris and poly wrapped beams still exists on the floor.
Inspection was done on micro trap machines and tents.
I observed five micro trap machines running without filters. Foreman was advised,
and he directed worker to attach the filters to the micro traps.
24 Gaylord boxes were on the floor ready to be taken out.
After following the decontamination procedure I signed the log book and left the decon.
I met LVI Supervisor Fabio Marino at the LVI office to discuss the findings of inspection.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code I = Violation Issued 2=No Violation Issued 3^No access 4-Project not started (no NOV)
5=Public Owned Property