NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection at 130 Liberty Street, Mar 2009

Machine-extracted title · confidence 25%

Asbestos inspection record for LMDC site with contractor details.

NYC-WTC_000265946
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/24/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj, Mgr/TRC Environmental 2:00 pm to 3:00 pm I arrived at the premise at 2:00 pm. LVI schedule informed that activities include: scrape fireproofing, clear off floor on S'^floor, clear off floor, scrape fireproofing, erect platforms various locations on 2"'' floor, clear floor, cut ducts, demo walls, ceilings on V floor. I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 3''^loor. One worker was present for the decon maintenance, cleaning and organizing the clean room. Negative air pressure on the floor was -0.035.

S"'’ Floor - I observed 36 workers inside the work area in the process of washing and cleaning beams, columns and scaffolds at the areas 11 and 12, using scaffolds and ladders, picking up saturated debris from the floor, placing into the boxes. Other workers were preparing and loading out boxes. 25 Gaylord boxes were on the floor ready to be taken out. 20 Micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the 2"“ floor. 2"‘‘ Floor - 55 workers were found inside the work area. Eagle scaffolding workers were erecting scaffolds at the high ceiling vestibule. Workers inside the shaft west 2 were cutting pipes and filling up the holes with foam. Workers were on scaffolds washing and cleaning the beams, columns at the areas 11 and 12, sweeping floor. At the high ceiling vestibule workers in scissor lift were cutting pipes and lifting them down. Other workers were sweeping the floor using equipment equipped with HEPA filters, preparing and loading out boxes. 18 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 22 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents I observed: 1. excess water on the floor at the waste decon, 2. light bulb was hanging with open cage. Supervisor was advised and he directed workers to repair the cage and pick up excess water. I used B stairwell to proceed to the 1®' floor. 1®* Floor - 67 workers were present on the floor. Workers on scaffold were cutting metal fixtures from the ceiling al the east side hallway. Workers on mezzanines were plasticizing the platforms and critical barriers. Eagle scaffolding workers were erecting platforms inside the west shaft. Workers in scissor lifts were cutting pipes at the various locations, removing insulation and cutting air ducts; clearing off shafts, placing debris into the boxes and spraying with amended water; cutting metal at the various locations into the pieces, wrapping beams, preparing and loading out boxes through the waste decon. A large amount of debris and poly wrapped beams exists on the floor. 50 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents. I observed that at the south site of the work area right next to the micro trap machines two workers were breaking the concrete ground using power tool with HEPA vacuum attached, but not powered on. Handler Supervisor was advised, and he directed workers to switch the cords and power the equipment. I used B stairwell to proceed to the 3"’ floor.

After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailers.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhaltan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code I = Violation Issued 2=No Violation Issued 3 No access 4=Projcct not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130782

NYC-WTC_000265946

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265946Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →