NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection report, NYC DEP

Machine-extracted title · confidence 25%

Asbestos inspection report basis and fee information for NYC DEP.

NYC-WTC_000265792
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET; 1200 312

ASBESTOS INSPECTION REPORT Basis of inspection: IF® - SF I LF ~ 0 228 OfRU^S^NOZi 19T 19f' 1,200 0 ONLY TYPEWRITTEN APPLICATIONS WILL BE i NOTE; ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED FEE EXEMPT: No 19L ACCEPTED 19T 0 420 TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE 1. $1,200.0 OF START OF THE WORK (ABATEMENT ACTIVITIES)

START DATE: 6/7/02 COMPLETION DATE: 4/30/03

1. FACILITY ADDRESS: 2 BROADWAY BORO: MANHATTAN ZIP: 1004

TYPE OFFACILITY: COMMERCIAL BLOCK: 11 LOT: 1

II. BUILDING OWNER

NAME: HRH CONSTRUCTION INTERIOR, INC.

TEL.#: ADDRESS: 2 BROADWAY CITY: NY STATE: NY ZIP: 10004 IV. ASBESTOS ABATEMENT CONTRACTOR

NAME: PAL ENVIRONMENTAL SAFETY CORP. TEL.#: (718)3490900 FEDERAL EMPLOYER IDENTIFICATION # : 11-3167874 ADDRESS: 43-09 VERNON BLVD. CITY: Lie STATE; NY ZIP: 11101 V. THIRD PARTY AIR MONITOR NAME; DONAHOE ENVIRONMENTAL TEL.#: ;212)2e0 98i£ ADDRESS: 39 BOWERY,BOX684 CITY: NEW YORK STATE: NY ZIP; 10022 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: EMSL ANALYTICAL INC. OF NYC NYSELAP#: 11506 ASBESTOS WORK SCHEDULE □ DAY .^EVENING NIGHT LI WEEKENDS WEEKDAYS

INSPECTOR NAME: SQUAD BADGE #: /VoO,?" DATE OF INSPECTION: /QJX TIME OF INSPECTION: From: ■JL’SO AM i ! PM S' AM PM Contact at site:

Inspection disclosed that the following sections were complied with: (Chech all that apply) I 1.51 ■ Notifications, Reports, Pla [ ! 1-71 ■ Air Sampling and Monitorin j । 1-91 - Worker Protection

1-101 ■ Materials and Equipment [ I 1-116 ■ Work Place Preparation I I 1-117 ■ Worker Decontamination System

I ] 1-118 - Waste Decontamination System j 1-126 - Engineering Controls I J 1-127 Entry/Exit Procedures

P j 1-129 • Maintenance of Barriers I i 1-138 - Encapsulation i n 1-139 - Enclosure

1140 ■ Glovebag 1-141 - Tent [ j 1-137 - ACM Disturbance, RemoveL, .Handling

[" I 1-146 - Preliminary Clean-up I 1-147 - Final Clean-up

P Project not started , Inspection

revealed all ACM to be intact. New start date: / / I Project ongoing, expected completion date: / / i Project completed on or about / . All surfaces, including abated surfaces are free of visible ACM and encapsulat

I ] Follow up necessary on/ / Samples taken: No | Yes 1 2 3

4 5 6 Photos taken: Yes | No

j Additional commenls:

CA— J ..

RESULT CODE BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND

RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPERVISOR ^ITIALy

4 = PROJECT NOT STARTED (NO NOV) 5 - PROJECT COMPLETED (NO NOV)

CITY_DEP_WORBY_CANNATA_SUBP_000129943

NYC-WTC_000265792

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265792Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →