J ARTMENT OF ENVIRONMENTAL PROTECTION Page 1 of 2
SBESTOS INSPECTION REPORT TOR omcB pimposE oray
TRU 0049MN02
cwxr : Boating Dept or TRU No.
AEPLZI STOS INSPECTION REPORT SHALL BE SUBMITTED
'C DEP NOT LESS THAN ONE WEEK IN ADVANCE OF 1. $200.00
BE ACi
______ (SEE HEM 17)
..a :ad OF THE WORK (ABATEMENT ACnVITIES)
I FA< OnWi larclay SZ^ggil5y/4HI
Zff »
2. ADD] r>naAl BORO Manhattoi CODE 00000-0000
AKA 3SM13/r Washington bet Vesey & Barclay 3. BLOCK n/a 4. LOT# n/a
5. 'TYPE OF FACILITY Excavation
NAME OF BUILDING 38M13/14/15 on Washington bet Vesey A Barclay
6. APPROXIMATE AGE OF BUILDING 32 YEARS OLD
7. DESCRIPnON OF PROPOSED WORK Emergency E2/02 -CTW removal to repair feeder pipe_______________________________
(e.g Removing end rephemg Old Boiler, Denmliiluni Building, Replacmg Phanbaig in Building, hstalling Fire Sprinklers, Major Aheratioiis, ACM Removal only)
H. BUILDING OWNER
9. CONTACT PERSON
8. NAME Consolidated Edison ofNew Yoik FOR THIS PROJECT Richard Slote
10. TEL. FAX#'
11. ADDRESS 4 Irving Place CITY New York STATE NY ZIP 10003-0000
HI. GENERAL CONTRACTOR
12. NAME TEL.# O
IV. ASBESTOS ABATEMENT CONTRACTOR 14. CONTACT PERSON
13. NAME Consolidated Edison Company of New York. Inc. FOR THIS PROJECT Richard Slate
15. FEDERAL EMPLOYER IDENTIFICATION
16. TEL.# (212)460-2795 FAX
17. ADDRESS 4 living Place, Room 828 CITY New York STATE NY ZIP 10003-3586
V. THIRD PARTY AIR MONITOR
18. NAME Testwell Laboratories, Inc. 19. TEL
20. ADDRESS 47 Hudson Street CITY Ossining STATE NY ZIP 10562-0000
in. »i> sample analysis
22. NYS DOH ELAP# 11142
/n. ASBESTOS PORTION OF PREMISES BEING ABATED/ALTERED/DEMOLISHED
23. ASBESTOS COVERED STRUCTURE(S) BEING WORKED ON aectrical Feeder Pipe__________ ____________ , _________
(Boiler, Ceilings, Pipes. Stonge Tanks, Plenirm Ducts, Decking, Ceilint TOes. etc.)
24. STARTING DATE FOR THIS PORTION OF WORK Ci/10/2002 PROJECTED COMPLETION DATE 02/11/2002
ASBESTOS WORK SCHEDULE WEEKENDS WEEKDAYS
25. TOTAL AMOUNT OF ASBESTOS CONTAINING MATERIAL (ACM) WHICH IS FRIABLE, OR MAY BECOME FRIABLE DURING
ABATEMENT/ALTERATIONDEMOLmON (ESTIMATED)
0 SQUARE FEET, AND/OR so LINEAR FEET ON PIPE
26. ASBESTOS HAULER NYSDEC
s’’ COMPANY NAME Horwith Trucking PERMIT# PA-263
DISPOSAL SrrE(S) Chemical Waste Management 1550 Baldmer Road
r 27. FHJNGFEE SCHEDULE . . ,
i FOR PROJECT DISTURBING: *7^ ? Y
1000 Linear Feet or more w 1000 Square Feet or mote offlifole ACM..;... ------ $1200 -
JU1^2« Linear Feet and less than lODOLinearFertm^ ; RECEIVED
' AIleastlMSquareFeetaDdlessthanlOOOSquareFeetof&tableACM.... S800
At least 100 Linear Feet and less than 260 Linear Feet or
At least 50 Square Feet and less than 160 Square Feet offiieble AOit..._ .................... JOat.................... $400
BUREAU OF EMVraONMEHTAl.
' Moicllian25UnearFeetandless than 100 Linear Feet or REMEDWTrOM * ENFORCEUEITT
g Mrmthan 10 Square Feet and less than 50 Square Feet offiiable ACM..... ......... aSBESTOErxannot------- $200
Circle appropriate Filing Fee and write it in ton l . Cranplete this report and submit to: '
A) The NYC Buildings Department wiib appUcation for pomit and filing fee. Check should be of Buildings
If no Dept of Buildings permit is required complete this repon and submit to:
B) The NYC DEP Asbestos Control Program with filing fee Check should be made payable to NYC Department ofEnvironmental Protection.
•Type of Facility -Hospital, Theater, 'Warehouse, Commercial Office Spaces. Apartment Buildings, etc.
ACM - Asbestos Containing Material means Material Containing Greater Than 1% Asbestos
FormHandling ' '
Do not detach any sheets. Insert carbon paper between the 4 pages and complete this aide, fold thia sheet and the tab FORMACP7
over the perforation so that all original entries ate made rat the white page. Reverse the carbon paper appropriately. 2«4
NYC-WTC_000252337
OCR can misread numbers and units. Confirm readings against the page image before using them.