NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 33 pages

Disaster 1391 project, NY, Mar 2003

Machine-extracted title · confidence 25%

Expense and applicant details for NYC/Design and Construction related to disaster project.

NYC-WTC_000251095–000251127
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

O.-itP (1,3/31 2U03 FEDERAL EMERGENCY MANAGEMENT AGENCY Project Completion and Certification Report {P.4) Disaster #; 1391

P A ID: 061 1)1000-19 Applicant; NEW YORK / DESIGN AND CONSTRUCTION, DEPARTMENT OF PW# VSN PKG# INF Cat Work Projected Approved PW Vo Actual Date Amt. Claimed Comments Done By Compl Date Amt. Compl. Completed by Applicant at ln«in__ _____________ __________________

MEW PLYWOOn FLOORING PAIN? INTERIOR AND EXTERIOR. INCLUDING NORTH PARAPET PLYWOOD SKIRTS (188 LINEAR FEET), 8 FEET HIGH ALONG PORTIONS OF LIBERTY STREET

THE CONSTRUCTION OF THE WALKWAY WAS COMPETITIVELY BID THROUGH DOC'S CONSTRUCTION MANAGEMENT AGREEMENT WITH THE BOVIS/AMEC ALLIANCE. THE COSTS ASSOCIATED WITH THE WALKWAY INCLUDE FLAT FEES FOR CONSTRUCTION (LUMP SUM PRICES) AND ANNUAL RENTAL FEES. WHICH APPLY ONE YEAR AFTER CONSTRUCTION OF THE STRUCTURE. ONE EXCEPTION IS THE RENTAL FEE FOR THE 250 LINEAR FOOT SIDEWALK SHED RENTAL COSTS FOR IT APPLY THREE MONTHS AFTER CONSTRUCTION. AN ANNUAL MAINTENANCE CONTRACT FOR THE ADA COMPLIANT ELEVATOR IS ALSO INCLUDED AS IS THE COST OF A LIABILITY INSURANCE POLICY (PUBLIC USAGE INSURANCE).

FUNDING FOR THE CONSTRUCTION OF THE PEDESTRIAN WALKWAY, ITS VARIOUS COMPONENTS ANO ITS EVENTUAL DISASSEMBLY ARE ELIGIBLE FOR REIMBURSEMENT UNDER FEDERAL REGULATIONS 44 CFR 206.225(3)(D) WHICH STATE- "EMERGENCY PUBLIC TRANSPORTATION TO MEET EMERGENCY NEEDS AND TO PROVIDE TRANSPORTATION TO PUBLIC PLACES AND SUCH PLACES AS NECESSARY FOR THE COMMUNITY TO RESUME ITS NORMAL PATTERN OF LIFE AS SOON AS POSSIBLE IS ELIGIBI E SUCH TRANSPORTATION IS INTENDED TO SUPPLEMENT BUT NOT REPLACE PRE-DISASTER TRANSPORTATION FACILI TIES THAT REMAIN OPERABLE AFTER A MAJOR DISASTER. FEMA FUNDING FOR SUCH TRANSPORTATION WILL BE DiSCONLINUED AS SOON AS THE NEEDS HAVE BEEN MET."

El IGIBLE COSTS ASSOCIATED WITH THE RENT AL OF THE SCAFFOLDING, ROOFING AND SPECIAL GATES IS LIMITED TO AF'PROXIMATELY .5 MONTHS, AS ALL EMERGENCY WORK PROJECTS ARE TO BE COMPLETED BY SIX MONTHS AFTER THE DISASTER DECLARATION. FOR THIS DISASTER, NEW YORK STATE EMERGENCY MANAGEMENT OFFICE HAS GRANTED A SIX-MONTH TIME EXTENSION THROUGH SEPTEMBER 11, 2002. THE WALKWAY WAS CONSTRUCTED IN APRIL 2002 THEREFORE THE ONLY ELIGIBLE PERIOD FOR RENTAL REIMBURSEMENT IS .8 MONIHS IHREE-MON/H RENTAL IS INCLUDED IN THE BID PRICE; THEREFORE, RENTAL COSTS FOR AN ADDITIONAL TWO MONTHS HAVE BEEN INCLUDED IN THE COST ESTIMATE.

THE ELIGIBLE FUNDING PROVIDED FOR UNDER I HIS PW IS BASED ON A COST ESTIMATE WHICH IS BASED ON THE BID DOCUMENTS AND PROPOSAL DOCUMENTS PROVIDED BY DDC (ATTACHED AS BACK-UP TO THIS PW) A SUMMARY OF THE COSTS IS ATTACHED. INCLUDING A BREAKDOWN OF THE FINISHING COSTS. AT THE COMPLETION OF THE PROJECT AND AFTER DDC HAS INCURRED ALL COSTS ASSOCIATED WITH THIS WORK, A FINANCIAL RECONCILIATION, OR CLOSE-OUT OF THIS PW WILL BE PERFORMED BY FEMA/SEMO. THE ELIGIBLE COSTS WILL BE ADJUSTED BASED ON FINAL, ACTUAL COSTS INCURRED

THE COSTS ASSOCIATED WITH THIS PW WILL BE INCLUDED IN THE PAYMENT REQUISITIONS SUBMITTED TO DDC FROM BOVIS/AMEC for THE DEBRIS REMOVAL PROJECT. THEREFORE. CLOSE-OUT OF THIS PW SHOULD COINCIDE WITH THE Cl OSEOIU OF THE BOVIS/AMEC PORTION OF THE DEBRIS REMOVAL PROJECT ADDRESSED UNDER SEPARATE PWS

Page 3 of 311

NYC-WTC_000251099

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000251099Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →