NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 33 pages

Disaster 1391 project, NY, Mar 2003

Machine-extracted title · confidence 25%

Expense and applicant details for NYC/Design and Construction related to disaster project.

NYC-WTC_000251095–000251127
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Date- (.)3/3!/2003 FEDERAL EMERGENCY MANAGEMENT AGENCY Project Completion and Certification Report (P.4) Disaster «: 1.391

P,A. ID. 001 51000-19 Applicant: NEW YORK / DESIGN AND CONSTRUCTION, DEPARTMENT OF

PW# VSN PKG# INF Cat Work Projected Approved PW % Actual Date Amt. Claimed Comments Done By Compl. Date Amt Comp!. Completed by Applicant at.lnsp— __ ______________ SITF NUMBER • FACILITY NAME : PEDESTRIAN WALKWAY ALONG LIBER IY STREET

LOCAl ION LIBERI Y street, between church and west STREETS SCOPE OF WOF^K Tl IE WALKWAY IS CONSTRUCTED THROUGH THE USE OF METAL SCAFFOLDING AND WILL REMAIN IN PLACE INDEFINITELY IT REQUIRED ADDITIONAL CONSTRUCTION IN THE FORM OF RAMPS AND AN ELEVATOR TO BE COMPLIANT WITH ADA. ELECTRIC LIGHTING ANO SAFETY STRIPING SLIPPLEMEN i IT. IN ADDITION, EXTRA ENGINEERING WAS NECESSARY TO CONSTRUCT HIGH CLEARANCE BRIDGES, AS WELL A.S TO CONNECT THE WALKWAY WITH THE REMAINING PORTION OF I HE SOUTH PEDESTRIAN BRIDGE, WHICH WAS PARTIALLY DESTROYED IN THE COLLAPSE OF WTC 2 & 3 THE STRUCTURE (INITIAL CONSTRUCTION COMPLETED IN APRIL 2002) INCLUDES THE FOLLOWING' CONSTRUCTION OF A SIDEWALK SHED (APPROXIMATELY 2,50 LINEAR FEET) CONSTRUCTION OF ACCESS STAIRS i CONSTRUCTION OF CONCRETE FOOTINGS 1 CONSTRUCTION OF A CONCRETE PAD IN SUPPORT OF THE ELEVATOR CONSTRUCTION OF SPECIAL BRIDGE SECTIONS OVER ROAD CROSSINGS (GREENWICH & WASHINGTON STREETS) i ICONSTRUCTION OF A ROOF OVER BRIDGE SECTIONS CONSTRUCTION OF A JUMP (40 LINEAR FEET) OVER THE FIRE HOUSE @1010 LIBERTY STREET i CHAIN LINK FENCES, 2 SLIDING GALES (2O'X15’), 4 PANIC DOORS ! lADA COMPLIANT ELEVATOR ELECTRIC LIGHTING AND SIGNAGE

PIE FINAL COMPONENT IN CONSTRUCT ING THIS WALKWAY IS THE ALTERATIONS TO THE EXISTING REMAINS OF "TIE SOU I H BRIDGE SUCH THA L IT WILL FUNCTION AS THE WALKWAY'S WESTERN TERMINUS, CONVEYING PEDESTRIANS OVER WEST STREET AND INTO THE WFC COMPLEX, SINCE THE PROJECT WILL LIKELY REMAIN IN PLACE FOR SEVERAL YEARS, THE DDC INITIATED A CHANGE ORDER TO PROVIDE F WISHING FOR THE WALKWAY, THE FINISHING, CURRENTLY IN PROGRESSAND EXPECTED TO BE COMPLETED IN EARLY HILY 2002, INCLUDES; SPECIAL GALVANIZED METAL CLADDING ASPHALT SHINGLE ROOFING GALVANIZED WIRE MESH FRAME BETWEEN WALLS AND THE ROOF ADDITIONAL FLUORESCENT LIGHTING

Page 2 of 311

NYC-WTC_000251 098

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000251098Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →