NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 33 pages

Disaster 1391 project, NY, Mar 2003

Machine-extracted title · confidence 25%

Expense and applicant details for NYC/Design and Construction related to disaster project.

NYC-WTC_000251095–000251127
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Date 03/31/2003 FEDERAL EMERGENCY MANAGEMENT AGENCY Project Completion and Certification Report (P.4) Disaster #: 1391

P.A. ID: 06 I -51000-19 Applicant: NEW YORK / DESIGN AND CONSTRUCTION. DEPARTMENT OF PW# VSN PKG# INF Cat Work Projected Approved PW % Actual Date Amt. Claimed Comments Done By CompI, Date Amt. CompI, Completed by Applicant af ln<sn BEEN ADDRESSED UNDER PW 97 (REFER TO PW 101) AND PW 767,

DDC HAS PROVIDED A VERBAL ESTIMATE FOR TULLY'S TOTAL COSTS FOR PHASE 1 IN THE AMOUNT OF $68,000,000. THIS ESTIMATE IS BASED ON BILLINGS TO DATE PLUS ESTIMATES PROVIDED TO DDC FROM TULLY FOR ADDITIONAL COSTS TO BE BILLED. THE ESTIMATE HAS BEEN REVIEWED BY FEMA AND APPEARS TO BE REASONABLE.

SINCE January 7, 2002, TULLY HAS MAINTAINED A REDUCED STAFF WHO'S PURPOSE IS TO FULFILL ALL OUTSTANDING CLOSEOUT REQUIREMENTS. SINCE January 7th, TULLY STAFF HAS MET WITH DDC AND FEMA STAFF TO PERFORM AN IN-DEPTH REVIEW OF ALL DOCUMENTATION AND TO DISCUSS ANY FINANCIAL ISSUES AND EXCEPTIONS GERMANE TO THE AFOREMENTIONED CLOSE OUT REQUIREMENTS.

AS PAYMENT REQUISITIONS FOR INCURRED COSTS ARE SUBMITTED BY TULLY TO DDC, FEMA REVIEWS THE REQUISITIONS WITH RESPECT TO FEMA PUBLIC ASSISTANCE PROGRAM ELIGIBILITY CRITERIA. AT THIS POINT FEMA HAS PERFORMED A PRELIMINARY REVIEW OF REQUISITIONS 1 THROUGH 15 SUBMITTED BY TULLY. HOWEVER, FEMA HAS NOT MADE A FINAL DETERMINATION REGARDING THE ELIGIBILITY OF THE COSTS PRESENTED IN THOSE REQUISITIONS. BECAUSE DDC HAS NOT APPROVED ANY OF THE REQUISITIONS. AFTER DDC APPROVES THE PAYMENT REQUISITIONS SUBMITTED BY TULLY OR WHEN DDC COMPLETES THE CONTRACT CLOSEOUT, FEMA WILL REVIEW THE REQUISITIONS TO DETERMINE THE FINAL, ELIGIBLE COST. AT THAT TIME A FINANCIAL RECONCILIATION. OR CLOSEOUT. OF THIS PW (ALONG WITH PWS 97/101 AND 767) WILL BE PERFORMED BY FEMA/SEMO, THIS MAY RESULT IN DEOBLIGATION OF FUNDS. DEPENDING ON THE ACCURACY OF DDC'S COST ESTIMATE.

FEMA WILL ALSO REVIEW ALL EQUIPMENT PURCHASED FOR THIS PROJECT TO DETERMINE AN ELIGIBLE FUNDING AMOUNT FOR THE EQUIPMENT. IF EQUIPMENT HAS RESIDUAL VALUE AT THE COMPLETION OF THE PROJECT, FEMA MAY REDUCE THE ELIGIBLE AMOUNT FOR THAT EQUIPMENT BASED ON THAT RESIDUAL VALUE. FEMA HAS DEDUCTED 5% OF DDC'S TOTAL ESTIMATE FOR TULLY'S COSTS FROM THE COSTS APPROVED UNDER THIS PW IN ORDER TO ACCOUNT FOR THE POTENTIAL RESIDUAL VALUE AND OTHER REQUISITION RECONCILIATION ISSUES.

IT SHOULD BE NOTED THAT ALTHOUGH TULLY HAD COMPLETED ALL DEBRIS REMOVAL ACTIVITIES AS OF January 7 2002 TULLY CONTINUED TO WORK ON AND AROUND THE WTC SITE ON VARIOUS INFRASTRUCTURE PROJECTS FOR DDC AND OTHER ENTITIES. SOME PROJECTS ARE ELIGIBLE FOR FEMA FUNDING; HOWEVER. FUNDING IS COVERED UNDER SEPARATE PW'S FOR EITHER THE DOT OR DEP. AS APPROPRIATE COSTS ASSOCIATED WITH THE INFRASTRUCTURE WORK INCLUDING COSTS ASSOCIATED WITH WORK PERFORMED BY TULLY'S SUBCONTRACTOR (ENTECH - SEWER CLEANING AND INVESTIGATION) ARE NOT ELIGIBLE UNDER THIS OR OTHER DEBRIS REMOVAL PW'S. THE COSTS ASSOCIATED WITH INFRASTRUCTURE WORK ARE separated FROM COSTS ASSOCIATED WITH THE DEBRIS REMOVAL CONTRACTS IN THE REQUISITIONS SUBMITTED TO DDC THEREFORE, CARE SHOULD BE TAKEN DURING CLOSEOUT OF THIS PW TO DEDUCT ALL INFRASTRUCTURE WORK COSTS FROM TULLY'S TOTAL COSTS.

THE CITY REQUIRED A COMPLIANCE MONITOR FOR THE DEBRIS REMOVAL PROJECT. THE NEW York CITY DEPARTMENT OF INVESTIGATION (DOT) HAS ESTABLISHED THE INDEPENDENT PRIVATE SECTOR INSPECTOR GENERAL (IPSIG) PROGRAM FOR MONITORING CONTRACTORS IN ORDER TO DO BUSINESS IN NEW York CITY. CERTAIN CONTRACTORS ARE ASSIGNED A CONTRACT COMPLIANCE MONITOR THAT IS PAID FOR BY THE CONTRACTOR. DOI IMPLEMENTED THIS PROGRAM FOR THE WTC DEBRIS OPERATION BECAUSE OF THE MAGNITUDE OF THE OPEfRATION. AND THE TIME AND MATERIAL PAYMENT BASIS EACH CM WAS ASSIGNED AN IPSIG COMPLIANCE MONITOR. THE TULLY MONITOR WAS DSFX. SOME FUNCTIONS THAT THE IPSIG COMPLIANCE MONITORS PERFORMED WERE AUDITS AND INVESTIGATIONS TO DETERMINE CM'S COMPLIANCE WITH LOCAL STATE AND FEDERAL CIVIL LAWS. RULES. REGULATIONS, AS WELL AS THE TERMS OF THE CONTRACT. THIS WORK IS CONSIDERED TO BE PROJECT MANAGEMENT; THEREFORE, THE WORK IS ELIGIBLE FOR FUNDING. TO DATE. DOI HAS APPROVED FIFTEEN (15) INVOICES FROM DSFX COVERING A PERIOD FROM 9/25/01 - 4/27/02. FEMA HAS REVIEWED AND CONCURRED WITH TWELVE (12) OF THESE INVOICES. PORT

Page 28 of 311

NYC-WTC_000251124

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000251124Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →