NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 33 pages

Disaster 1391 project, NY, Mar 2003

Machine-extracted title · confidence 25%

Expense and applicant details for NYC/Design and Construction related to disaster project.

NYC-WTC_000251095–000251127
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Date: 03/31/2003 FEDERAL EMERGENCY MANAGEMENT AGENCY Project Completion and Certification Report (P.4) Disaster#: 1391

P.A. ID: 061-51000-19 Applicant: NEW YORK / DESIGN AND CONSTRUCTION, DEPARTMENT OF PW# VSN PKG# INF Cat Work Projected Approved PW % Actual Date Amt. Claimed Comments Done By Compl. Date Amt. Compl. Completed by Applicant at Ingn.

SITE NUMBER . 1 FACILITY NAME : WTC DEBRIS. CONTRACT 4 I (ICAI ION NEW YORK CITY. NEW YORK SCOPE Of WORK TULLY CONSTRUCTION COMPANY. INCORPORATED (TULLY) WAS HIRED BY DDC, AS ONE OF FOUR CONSTRUCTION MANAGERS (CMS), FOR REMOVAL OF THE CONCRETE, STEEL AND OTHER MIXED DEBRIS FROM DESIGNATED AREAS WITHIN THE WTC COMPLEX. THE DEBRIS REMOVAL AND ASSOCIATED WORK. UNLESS OTHERWISE NOTED, WAS PERFORMED ON A TIME AND MATERIALS BASIS AT THE WTC COMPLEX PURSUANT TO A DRAFT CONTRACT WITH DDC. THE WORK WAS BOTH SELF-PERFORMED AND PERFORMED BY SUBCONTRACTORS AND/OR CONSULTANTS HIRED BY TULLY. FROM TIME TO TIME DDC HAS ISSUED CLARIFICATIONS TO THE CONTRACT AND CITY PROCEDURES. THESE CLARIFICATIONS HAVE BEEN ACCUMULATED BY DDC IN A PROJECT SPECIFIC BINDER(S) CALLED THE "POLICY/ PROCEDURE BOOK." THESE CLARIFICATIONS TAKE PRECEDENCE OVER THE DRAFT CONTRACT. ALSO, THE CONTRACT REQUIRES CERTAIN APPROVALS BY THE CITY IE STAFFING PLANS, DILLING RATES, BID PROCUREMENTS, ETC... THESE ALSO HAVE BEEN ACCUMULATED BY DDC FOR THIS SPECIFIC PROJECT AND IS REFERRED TO AS THE "APPROVALS BOOK".

ON January 7, 2002, THE RDC CONSOLIDATED ALL DEBRIS REMOVAL ACTIVITIES UNDER ONE CM, BOVIS LEND LEASE, WORK PERFORMED FROM September 11. 2001, THROUGH January 7. 2002, IS REFERRED TO AS PHASE I. DDC AND TULLY ARE IN THE PROCESS OF CLOSING OUT THEIR AGREEMENT BY RECONCILING THE PAYMENTS PROVIDED BY DDC AGAINST THE PAYMENT REQUISITIONS SUBMITTED BY TULLY. TULLY HAS COMPLETED ALL DEBRIS REMOVAL WORK; HOWEVER THEY WILL CONTINUE TO INCI IR COSTS ASSOCIATED WITH CLOSEOUT WORK AND WILL CONTINUE TO SUBMIT REQUISITIONS DETAILING THE COSTS

IHIS PW HAS BEEN WRITTEN FOR PHASE 1 WORK PERFORMED DURING THE PERIOD OF April 13. 2002. THROUGH December 31.2002. FEMA HAS GRANTED A TIME EXTENSION FOR DDC THROUGH December 31, 2002, FOR THE COMPLETION OF THE PROJECT AS STATED ABOVE. ALL OF TULLY’S PHYSICAL DEBRIS REMOVAL ACTIVITIES HAS BEEN COMPLETED THE ONLY REMAINING WORK IS ASSOCIATED WITH CLOSING OUT ITS AGREEMENT WITH DDC. WORK PERFORMED DURING THE PERIOD OF 9/11/01 T HROUGH April 12. 2002 HAS

Page 27 of 311

NYC-WTC_000251123

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000251123Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →