Minimum contractor requirements for asbestos removal, 100 Church Street

Machine-extracted title · confidence 38%

Contractor COC outlines asbestos-containing dust removal on selected floors of 100 Church Street.

NYC-WTC_000243907–000243914
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

'SEP-28-01 FRI 03:31 PM RHKP FAX NO. P, 04/10 ' SEP-2«'^0I "'Sf' b2i 35 PM AMBIENT "GROUP INC' FAX NO. 212 76'8 1540 P. 04

MINIMUM CONTRACTOR REQUIREMENTS I

tape. At each perimeter breach place at least three separate layers of poly so (hat i one layer can be left in place after air clearance monitoring and until the breach can be repaired permanently. 1.5 On each respective floor, select a single location as means of acccs.s onto tlic floor. It will either through tho freight elevator corridor or stairwell. Seal all other communicating openings, wWch lead onto the respective floor. These openings can Include but not be limited to all passenger elevator doors, emergency stairwells, shafts, all HVAC supply and return diffusers, etc. 1.6 Isolate any unaffected (non-contaminated) areas from the areas to be work in. After cleanup Is successfully corcpleted in each respective area of a.floor, Isolate area so as avoid possible re-contatninatlon of clean areas. 1.7 AU contaminated areas on floors are to be cleaned and released prior to cleanup of any non-contamlnatcd areas, Non-contamlnated areas can be cleaned as a non- ACM activity. 1.8 Coordinate with Tenant Representative the decontamination of any employee personal property and tenant office fixtures. 1,3 Perform the work in strict compliance with applicable federal, Slate, and local regulations, codes, standards and guidelines regarding asbestos abatement except where more stringent requirements arc set forth herein, Where conflicting requirements are set forth in the above, the more stringent requirements or guideline.? shall apply. Require that all work be executed by skilled craftsperson experienced in their respective trades. 1,4 The most recently dated issue or set of the following documents shall govern, If any of these documents are revised or updated prior to the final completion of the project, (he levLsed or updated issue shall govern and all work affected by the revision or update shall be modified accordingly.

a) New York State Industrial Code, Rule 56 “ Asbestos (12 NYCRR 56) b) New York City Local Law 70 and Title 15, Chapter 1. c) All other applicable NYS and NYC laws, codes, variances and ordinances. d) USEPA regulations for asbestos abatement projects. Final Rule (CPR 40 Part 763) e) USEPA regulations for Asbestos, CFR 40 Part 61, Subpart M, National Emission Standards for Hazardous Air Pollutants (NESHAPS) f) U.S, Department of Labor, Occupational Safety and Health Administration (OSHA) Asbestos Regulations (CRF 29, Parts 1910 and 1926). g) USEPA Office of Pesticides and Toxic Substance, “Guidance for Controlling Asbestos- Coawinlng Materials In BuUding", BPA 560/5-85-024, June 1985, Maintain one copy of each reference standard on site for the duration of the project. 1,5 The Work shell be sequenced as follows:

a) Isolate the work area by establishing a restricted zone around the area. Protect, as necessary. b) Construct applicable remote decontamination system. c) Erect appropriate enclosure In the work area. ttKMifVAt OFAC1» i)VSr PAGSi ZARRtaldi Helefte^ f'lMn/Anat Cfutreh Strut

CITY_21 MCI 00 0'4587387 NYC-WTC_000243908

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243908Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000416762

Contract specs for abatement of asbestos-containing materials at Police Academy.

Similar indexed content

Compare copies and versions →