Minimum contractor requirements for asbestos removal, 100 Church Street

Machine-extracted title · confidence 38%

Contractor COC outlines asbestos-containing dust removal on selected floors of 100 Church Street.

NYC-WTC_000243907–000243914
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SEP-28-01 FRl 03:31 PM RHKP FAX NO. P. 03/10 -01 ER 1 02 i 34 PM AHBI ENT GROUP INC FAX NO. 212 768 1540 P. 03

MINIMUM CONTRACTOR REQUIREMENTS

I MINIMUM CONTRACTOR REQUIREMENTS FOR THE REMOVAL OF ASBESTOS-CONTALNING DUST AND ASSOCIATED DEBRIS PROM WITHIN SELECTED FLOORS/AREAS OF IM CHURCH STREET NEW YORK, NY 10013 AMBIENT GROUP INC., PROJECT #211334

1.0 PROJECT summary

LI The Work includes cleanup and disposal of asbescos-rontaining material (ACM) and or contaminated dust from selected floors/lovcis located within 100 Church Street, The accumulation of dust was the result of the recent World Trade Center collapse. Dust and pulverized building construction debris has migrated into selected areas/floors of the building tluough pcnctrations/opcnings in the building's exterior facade. The cleanup work shall be performed In a phased approach on a floor-by-floor basis, After proper isolations barriers and decontamination units have been erected, multiple floors can been cleaned simultaneously. On floors where contaminated aress are separated by clean areas, work in respective areas cannot be started until unaffected areas and decontaminated areas have been isolated from the new work area. Cleanup work shall be accomplished using individuals certified by flic New York City Dcpaitcncnt of Environmental Protection (NYC DEP) as asbestos handlers. All work shall be performed in accordance widi Title 15, Chapter I of ths Rules of (lie City of New York.

1.2 All effected horizontal surfaces Including the suspended ceiling tile shall be treated as a contaminated surface. Prior to commcncliig any floor/area cleanup, review wldi the Envifotimcntal Consultant and/or a representative of the Owner for identification of the . respective work area boundaries on. each affected floor. Refer to attached floor plans for general boundaries of selected areas to be decontaminated.

The Work of this project shall be accomplished as follows. The tasks need not be performed in sequential order.

LI Confirm that the Building’s Air Circulation System is not operating, All cleanup activities shall be perfoimed prior to re-activation of the Building’s Air Handling Equipment,

1.2 Construct a remote decontamination unit in a location, which can effectively be utilized for die required work within each respective floor, Thoroughly clean this area prior to the construction of the decontamination unit using wet wiping and/or HEPA vacuuming procedures.

L3 As directed, clean interior surfaces of selected Building’s Air Circulation System at each fresh air intake/plenum upstream of the filters. Remove all system &u filters and dispose as contaminated material.

1.4 At each respective floor/arca where cleanup Is required, seal all penetrations, broken windows, brcac.hc.s in building’s fagade, etc, witli 6-ini1 poly and duct ft^»i(t3VAJL0PA(^PVST PACE I ZAiRinUji Sfieftea PharffAriiaje iOO ChunA Street

CITY_21 MC100_014587386 NYC-WTC_000243907

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243907Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000416762

Contract specs for abatement of asbestos-containing materials at Police Academy.