NYC-WTC_000243915
COC detailing asbestos removal and dust disposal for areas within 100 Church Street.
10 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗Contractor COC outlines asbestos-containing dust removal on selected floors of 100 Church Street.
NYC-WTC_000243907–000243914OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
SEP-28-01 FRl 03:31 PM RHKP FAX NO. P. 03/10 -01 ER 1 02 i 34 PM AHBI ENT GROUP INC FAX NO. 212 768 1540 P. 03
MINIMUM CONTRACTOR REQUIREMENTS
I MINIMUM CONTRACTOR REQUIREMENTS FOR THE REMOVAL OF ASBESTOS-CONTALNING DUST AND ASSOCIATED DEBRIS PROM WITHIN SELECTED FLOORS/AREAS OF IM CHURCH STREET NEW YORK, NY 10013 AMBIENT GROUP INC., PROJECT #211334
1.0 PROJECT summary
LI The Work includes cleanup and disposal of asbescos-rontaining material (ACM) and or contaminated dust from selected floors/lovcis located within 100 Church Street, The accumulation of dust was the result of the recent World Trade Center collapse. Dust and pulverized building construction debris has migrated into selected areas/floors of the building tluough pcnctrations/opcnings in the building's exterior facade. The cleanup work shall be performed In a phased approach on a floor-by-floor basis, After proper isolations barriers and decontamination units have been erected, multiple floors can been cleaned simultaneously. On floors where contaminated aress are separated by clean areas, work in respective areas cannot be started until unaffected areas and decontaminated areas have been isolated from the new work area. Cleanup work shall be accomplished using individuals certified by flic New York City Dcpaitcncnt of Environmental Protection (NYC DEP) as asbestos handlers. All work shall be performed in accordance widi Title 15, Chapter I of ths Rules of (lie City of New York.
1.2 All effected horizontal surfaces Including the suspended ceiling tile shall be treated as a contaminated surface. Prior to commcncliig any floor/area cleanup, review wldi the Envifotimcntal Consultant and/or a representative of the Owner for identification of the . respective work area boundaries on. each affected floor. Refer to attached floor plans for general boundaries of selected areas to be decontaminated.
The Work of this project shall be accomplished as follows. The tasks need not be performed in sequential order.
LI Confirm that the Building’s Air Circulation System is not operating, All cleanup activities shall be perfoimed prior to re-activation of the Building’s Air Handling Equipment,
1.2 Construct a remote decontamination unit in a location, which can effectively be utilized for die required work within each respective floor, Thoroughly clean this area prior to the construction of the decontamination unit using wet wiping and/or HEPA vacuuming procedures.
L3 As directed, clean interior surfaces of selected Building’s Air Circulation System at each fresh air intake/plenum upstream of the filters. Remove all system &u filters and dispose as contaminated material.
1.4 At each respective floor/arca where cleanup Is required, seal all penetrations, broken windows, brcac.hc.s in building’s fagade, etc, witli 6-ini1 poly and duct ft^»i(t3VAJL0PA(^PVST PACE I ZAiRinUji Sfieftea PharffAriiaje iOO ChunA Street
CITY_21 MC100_014587386 NYC-WTC_000243907
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000243915
COC detailing asbestos removal and dust disposal for areas within 100 Church Street.
10 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455928
CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.
9 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
9 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154680
Formal notification document for an asbestos project including submission instructions and official use fields.
7 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000416762
Contract specs for abatement of asbestos-containing materials at Police Academy.
8 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453278
Chain-of-custody for asbestos-related samples under Part 56 rules in NYC WTC context.
6 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448332
DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.
6 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438568
Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.
6 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000450663
City asbestos regulatory document referencing NYS Part 56; file with NYC-WTC code tag.
6 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443384
State regulation reference: Part 56 of Title 12 NYCRR, asbestos compliance document.
6 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448811
New York City Part 56 asbestos documentation, NYC-WTC.
6 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446470
State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.
6 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000243915
COC detailing asbestos removal and dust disposal for areas within 100 Church Street.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000364399
Report of bulk sample collection at 100 Church Street for WTC-related work.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000124241
Letter from ATC Associates regarding confirmatory asbestos bulk sampling conducted on the roofs of 99 Church Street.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243915
COC detailing asbestos removal and dust disposal for areas within 100 Church Street.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126593
Document outlining minimum contractor requirements for asbestos abatement work at 100 Church Street.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000364399
Report of bulk sample collection at 100 Church Street for WTC-related work.
Similarity score 0.972 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000243915
COC detailing asbestos removal and dust disposal for areas within 100 Church Street.
Similar indexed content
NYC-WTC_000455928
CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.
Similar indexed content
NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
Similar indexed content
NYC-WTC_000154680
Formal notification document for an asbestos project including submission instructions and official use fields.
Similar indexed content
Contract specs for abatement of asbestos-containing materials at Police Academy.
Similar indexed content