NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 166 pages

Bulk sample report, 100 Church Street site

Machine-extracted title · confidence 55%

Report of bulk sample collection at 100 Church Street for WTC-related work.

NYC-WTC_000364399–000364564
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

MINIMUM CONTRACTOR REQUIREMENTS

d) Established negative air pressure. e) Cleanup all ACM Dust within the affected work area. f) Project decontamination. g) Final air clearance and demobilization.

1.6 Ensure that all workers entering the work areas have valid New York City and New York State Asbestos Abatement Handler's certificates in their possession.

1.7 Coordinate with Building Engineer for location of temporary electrical service, as needed, during the work.

1.8 Air monitoring for Owner will be performed by Testing Laboratory. Contractor shall be responsible for air monitoring for the safety of its employees.

1.9 Contractor, subcontractors and their employees shall strictly adhere to all building admittance and exit procedures

1.10 Limit use of the premises to work areas indicated. Access the premises through designated locations only.

1.11 Maintain each reflective floor in which cleanup activity will be performed in a safe and weather tight conation throughout the work. Take all precautions necessary to protect any clean unaffected areas adjacent to the work from being contaminated.

1.12 Do not allow any accumulation of waste, rubbish or construction debris in the work area while cleanup work is in progress.

1.13 Do not permit smoking or qpen fires within the building enclosure or on die premises. Do not permit any alcoholic beverages on site.

1.14 Except for toilet room facilities designated for use by Contractor, use of existing toilets within the building by Contractor will not be permitted.

1.15 Except for the designated elevator, use of elevators by Contractor will not be permitted. Contractor will be permitted to use die designated elevator, if available, for temporary freight service and the transportation of construction personnel during the construction period. Coordinate elevator usage with the Engineer.

1.16 Removal of asbestos waste from die building will be in accordance to any time restriction imposed by the Owner.

2.0 SECTION NOT USED

3.0 TESTING LABORATORY SERVICES

3.1 Owner will provide a qualified Testing Laboratory to perform quality assurance testing of the work performed under the Contract Documents to determine general compliance.

3.2 Provision of the Testing Laboratory by Owner to perform testing for Owner shall not relieve Contractor from providing its own air testing for compliance with all applicable codes, regulations, requirements and as specified in this Section and elsewhere in the REMOVAL OF ACM DUST PAGES ZARRealty Selected Floors/Areas 100 Outrch Street

CITY_DEP_WORBY_CANNATA_SUBP_000001843

NYC-WTC_000364403

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000364403Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →