Minimum contractor requirements for asbestos removal, 100 Church Street

Machine-extracted title · confidence 38%

Contractor COC outlines asbestos-containing dust removal on selected floors of 100 Church Street.

NYC-WTC_000243907–000243914
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SEP-28-01 FRI 03:32 PN RHKP FAX NO. P. 05/10 SEP-28'01 FRI 02:35 PM AMBIENT GROUP INC FAX NO. 212 760 1540 F. Ob

MINIMUM CONTRACTOR REQUIREMENTS

d) Established negative air pressure. Cleanup all ACM Dust within the affected work area. §s) ■ Project decontamination. Filial air clearance and demobilization. 1,6 Ensure that alt workers entering (he work areas have valid New York City and New York State Asbestos Abatement Hatxller's certificates b their possession. 1.7 Coordinate with Building Engineer for location of temporary electrical service, as needed, during the work. 1,8 Air ittonitoring for Owner will be performetl by Testing Laboratory. Contractor shall be responsible for alt monitoring for the safety of its employees.

J.9 Contractor, subcontractors and their employees sliall strictly adhere to all building admittance sad exit, procedufes I.IO tbnit use of the premises to work areas indicated, Access the premises through designated locations only. 1.11 Maintain each respective floor in which cleanup activity will be performed in a safe and weather tight condition throughout the work. Take all precautions necessary to protect any clean unaffected areas adjacent to the work from being contaminated.

1.12 Do not allow any accumulation of waste, rubbish or construction debris in (he work area while cleanup work is In progress, 1.13 Po not pemdt smoking or open fires within the building enclosure or on the premises. Do not penult any alcoholic beverages on site. 1.14 Except for toilet room facilities designated for use by Contractor, we of existing toilets within the building by Contractor will not be permitted. 1.15 Except for the dc.signatcd elevator, use of elevators by Contractor will not be permitted. Contractor will be permitted to use the designated elevator, if available, for temporary freight seivice and the transportation of construction personnel during the construction period. Coordinate elevator usage with the Engineer. 1.16 Removal of asbestos waste from the building will be in accordance to any time restriction imposed by the Owner. 2,0 SECTION NOT USED 3.0 TESTING LABORATORY SERVICES .3.1 Owner will provide a qualified Testing Laboratory to perform quality assurance testing of ths work performed under tlie Contract Documents to determine general compliance. 3.3 Frovisioa of the Testing Laboratory by Owner to perform testing for Owner shall not relieve Contractor from providing Its own air testing for compliance with all applicable codes, regulations, requirements and as specified in this Section and elsewhere in the MWK4/, OPAW/iUST PAGES PltK>ts/Artos IW Chvfck Stretl

CITY_21 MCI 00_014587388 NYC-WTC_000243909

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243909Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000416762

Contract specs for abatement of asbestos-containing materials at Police Academy.

Similar indexed content

Compare copies and versions →