Minimum contractor requirements for asbestos removal, 100 Church Street

Machine-extracted title · confidence 38%

Contractor COC outlines asbestos-containing dust removal on selected floors of 100 Church Street.

NYC-WTC_000243907–000243914
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

■SEP-28-01 FR] 03:33 PM RHKP FAX NO. P. 08/10 ' , SEP-SHI FRI 02135 PM AMBIENT GROUP INC FAX NO. 212 738 1340 P. 06

MWMUM CONTRACTOR REQUIREMENTS Contract Documents (c.g. OSHA air monitoring). 3.3 Cooperate with Testing Laboratory in all aspects of the testing to expedite results.

3.4 Provide Testing Laboratory representative access to the Work in locations requested .is necessary to perforin testing. 3.5 Pay for.all re-testing subsequent to unsatisfactory preliminary and final air tests as required in die Contract Documents.

3.e Provide electrical power service to all locations where Testing Laboratory is to perform cesdne. 3.7 All aualyticfil methods shall be in accordance with New York State and New York City requirements, the mote stringent to apply. 3.8 Transmission Electron Microscopy (TEM) will be performed for background, Phased Contrast Microscopy (PCM) will be performed during the cleanup activitie.s using substantially the procedures outlined in the MOSH 7400 method using "A“ counting rules. Titis analysis will be carried out at the Testing Laboratory's ELAP approved testing laboratory. 3.9 Before start of the Work, the Testing Laboratory will secure air samples at the work she to establish a background level before start of Work. - ,3.10 Samples will _bc collected by Testing Laboratory at times during the Work as deemed necessary by Texting Laboratory and Engineer, 3,11 Testing Laboratoty will perform final aggressive clearance air monitoring after Engineer observes that the area has been cleaned in accordance to regulatory requirements. 3.12 Owner wilt pay for daily environmental ak testing and initial preliminary and final air clearance testing required by the Contract Documents. 3.13 If additional testing is required due to eidier a breach in (he containment or Contractor’s non-compliance with the Contract Documents, the testing will be performed by Testing Laboratoty. 4.0 WORKER PROTECTION 4.1 This Section describes the equipment and procedures required for protecting workers against asbe.scos contamination and otiier work place hazards. 4.2 Require tliat each worker always wear a respirator, properly fitted on the face, in the work area from the start of any operation which may cause airborne asbestos fibers until the. work area is completely decontaminated, Provide respiratory protection appropriate for the fiber level encountered in die work place or as required for other toxic or oxygen- deficient .sllutitlons encountered.

4.3 Instruct and train each worker Involved in asbestos abatement in proper use of protective clothing atvl require that each worker always wear protective clothing in the work area »SMOV,\LOFACAiDUST PAOS 4 Z4.R Sehclid nuvrs/Anas

CITY__21 MCI 00_014587389 NYC-WTC_000243910

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243910Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000416762

Contract specs for abatement of asbestos-containing materials at Police Academy.

Similar indexed content

Compare copies and versions →