NYC 9/11 Public Portal Document
FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No 3067-0151 PROJECT WORKSHEET • Narrative Sheet Expires April 3C. 2001
DECLARATION NO PROJECT NO. FI^S NC i CATE CATEGOR'^ FEWA- 1391 -DR- NY 061-51000-22 J 02.'27/02 APPLICANT COUNTY New York City, Board of EOucslion New York NAPRATiVE
More than 200,OOC tons ol steel and 425,000 cubic yards of concrete v/ere used in the construction of the WTC complex. Ore WTC (North Tower) was completed in December of 1970 and Two WTC (South Towei) was compieieo in January o‘ 1972. The federal regulations restricting the use cf asbestos in concrete and other consiruction material began to be enforced in the early l97Q s Although asbestos gives concrete a much higher tensile strength, asbestos fibers are known to have caused Such diseases as Asbeslosis and Mesothelioma, as well as lung cancer, when inhaled These asbestos fiber? are most hazardous when tney are m a triable or pulverized state.
The U.S Environmental Proteclion Agency (EPA) - Asbestos Hazard Emergency Response Act (AHERA), Section 206 of Toxic Substance Conto' Act (TSCA) states that it's legal function is to provide for tne establishment of Federal regulations which require inspection fcr asbestcs-containing material and implementation of appropriate response actions with respect to asbestos-containing material m tne Nation's schools m a safe and complete manner and to mandate safe and complete periodic reinspection of school buildings following response actions, where appropriate. A memorandvm from R Radhakrsnnen. P.E. from the City of New York, Department of Environmental Protection, dated September 14, 2001, gave guidance to building owners on procedures tor clean-up of asbestos containing materials (see attached document) . This memorandum and the U.S. Environmental Protection Agency (EPA) - Asbestos Hazard Emergency Response Act (AHERA), Section 206 of the Toxic Substance Control Act (TSCA) were used as a basis for the necessao' procedures to be performed al each school
School Construction Authority (SCA) School Consiruction Authority was responsible for the coordination and construction management of the contractors on behalf of BoE The School Consnucbon Authorty (SCA) acis on behalf of the New Yorx Board of Education (BoE) to manage all major construction, repairs, rehabilitation and clean up of all New York City schools. Costs associated with the work performed by SCA consists of regular time labor ($3,619.24), including the New York City regular time fringe benefit rate for non-uniform employees of 44.66% (S1.616.36). Total incurred cost for regular time labor is $5,235.60. Costs associated with the overtime for labor tor SCA (10,007.66), including the New York City overtime fringe benefit rate for non-uniform employees of 110.73% ($1,073.83). Total incurred cost for overtime labor is $11,081.49.
KISS Construction, Inc, KISS Construction Inc. conducted clean up at PS 234 from October 4 to October 7, 2031 This cleanup work consisted o* asbestos abatement oi the facility following the period the school was being used as a relief center. Clean-up performed by KISS Construction cost $156 789.50 invoice from KISS Construction is included in "Back Up Do Not Scan"
DAI ifety Coi PAL Environmental Safety Corporation was retained by SCA to conduci exterior and interior clean up of PS 234. Dust and debris within the building was considered to be potentially contaminated with asbestos Interior remediaiion of the facility was performed tn accordarice to AHERA regulations. Scope of work performed by PAL for the interior remediation included labor, materials, equipment, OSHA moniionng and waste disposals. Man lifts were used to facilitate the power washing of the extenor of the building with gas pressure washers Work was performed as a non-asbestos containing material clean-up because emissions and exposure during the aclivity would be minimal because the operation was conducted in an "open" environment. Intericr and extenor cleaning performed by PAL Environmental cost $455,620.66. Invoice from PAL Environmental »s irKluded m "Back Up Do Not Scan".
Citvwide Environmental Services, LLC Citywide Environmental Services. LLC was retained by SCA to clean the HVAC system in PS 234. This was p>erformed to 'emove ali dust and debris potentially contaminated with asbestos and to prevent asbestos containing material to spread throughout the buiioing. Ali work pedormeo under this contract was in accordance to AHERA regulations. Costs associated with HVAC cleaning performed by Citywide Environmental was $371,530.65. invoice from Citywide Environmental is mcluoed in "Back Up Do Not Scan'
Corinthian Construction Corinthian Construction was retained to remove all debris and Oust from the roof of the building. Because ol the line particulate of the dust, all stones and insulation were removed from the roof to expose the roof membrane. The roof membrane was washed thoroughly of all dust and debris, and new installation, filter fabric and stone were replaced to its state prior to the event. Roof cleaning conouctedl by Corinthian cost $159,600.00 Invoice from Corinthian is included m "Back Up Do No' Scan" \
Taylor Environmental Group, Inc. I During the ctean-up and remediation project al PS 234, Taylor Environmental Group. Inc was retained to conduct Quality control I asbestos project monitoring and anatyiical services. Prior 10 the collection of TEM air samples. Taylor Environmental conducted vtsuaf inspection? to identify if there was a presence of visible dust ano debris Quality control air monitorino and analytical services provided by Taylor Environmental totaled $2,100.00. Invoice from Taylor Environmental is included in "Back Up Do Not Scan"
Warren & Panzer Engineers Warren S Panzer Engineers conducted aggressive air sampling of the basement 1 st floor. 2nd floor. 3r0 floor, the mechanical room and the venlilaVun system of PS 234. The samples analyzed tor transmission electron microscopy (TEW) Work pertormed by Warren and Panzer total $71,610.34. A copy of the invoice for work performed by Warren & Panzer Engineers was not obtained from SCA
TDX-Becom Joint Venture The TC>-3ecom jomt Venture was retained by SCA to perform construction managemeni and oversight duties al F.S 234 to coordinate the contradual duties and to insure that work performed by contractor? met the proposed scope of work ano professional quality TDX-Becom was also responsible to insure that the work perform.ed adhered to AHERA regulations. Costs associafeo with conplruchon management and inspection by TDX/Becom totaled $35,733.23 Invoice tiom TOX'Becom is inr.liiheh in "harx .jp Do Not Scar'
PREPARED BY Dan Mahiri Project Otitcer FEMA Form 90-91A. SEP 98
CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC1OO_O1329O648
SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000243504
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000411637
FEMA project worksheet for NY disaster with cost estimates and CFR references.
10 shared non-person entities · 1 shared topics · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243516
FEMA project worksheet for WTC construction materials context and asbestos discussion.
10 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000219966
Federal Emergency Management Agency worksheet documenting disaster declaration and narrative regarding asbestos risks in New York City school construction materials.
17 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251589
FEMA project worksheet and paperwork burden disclosure for disaster-related work.
18 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359491
Project worksheet with declaration and category for WTC asbestos context.
18 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385739
Narrative describing WTC steel and concrete usage and asbestos regulations.
17 shared non-person entities · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359488
FEMA project worksheet narrative on WTC construction materials.
16 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385741
FEMA worksheet re: WTC and asbestos regulations with sample data.
12 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359490
Narrative on asbestos considerations in WTC construction materials.
11 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359494
Project worksheet with declaration and category for WTC asbestos context.
11 shared non-person entities · 1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359486
FEMA project worksheet narrative on WTC asbestos context.
9 shared non-person entities · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359485
FEMA project worksheet describing WTC construction and asbestos context.
10 shared non-person entities · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000251589
FEMA project worksheet and paperwork burden disclosure for disaster-related work.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000219966
Federal Emergency Management Agency worksheet documenting disaster declaration and narrative regarding asbestos risks in New York City school construction materials.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385739
Narrative describing WTC steel and concrete usage and asbestos regulations.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385741
FEMA worksheet re: WTC and asbestos regulations with sample data.
Similarity score 0.982 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411637
FEMA project worksheet for NY disaster with cost estimates and CFR references.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243516
FEMA project worksheet for WTC construction materials context and asbestos discussion.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000219966
Federal Emergency Management Agency worksheet documenting disaster declaration and narrative regarding asbestos risks in New York City school construction materials.
Similar indexed content
FEMA project worksheet and paperwork burden disclosure for disaster-related work.
Similar indexed content
NYC-WTC_000359491
Project worksheet with declaration and category for WTC asbestos context.
Similar indexed content
NYC-WTC_000385739
Narrative describing WTC steel and concrete usage and asbestos regulations.
Similar indexed content
NYC-WTC_000359488
FEMA project worksheet narrative on WTC construction materials.
Similar indexed content